Consumer Unit Cost
Consumer unit cost is POA after we see the existing board, tails and earthing. iComply will not invent a pound price for an RCBO or dual-RCD upgrade.
About Consumer Unit Cost
Consumer unit cost is POA after we see the existing board, tails and earthing. iComply will not invent a pound price for an RCBO or dual-RCD upgrade.
A simple like-for-like swap in an accessible cupboard is a different job from a metal-clad board, SPD, or a meter-operator tail change. We quote from Stockport for Greater Manchester and the North West once that is clear. Related fuse board and consumer unit upgrade pages explain the technical options; this page is only about honest POA pricing.
- ●POA after we see the existing board
- ●RCBO, dual-RCD and SPD options scoped on quote
- ●Tails and earthing checked before we price
- ●No catalogue pound figures
Part of our Electrical service · Related: Consumer Unit
Brands we install & service
Click a manufacturer for products, kits and install quotes related to Electrical and Consumer Unit Cost.
Consumer Unit Cost by area
Local landing pages for every town we cover (60 areas) — e.g. Consumer Unit Cost in Stockport.
Related Electrical guides
More topics under the same service — each also has pages for every Greater Manchester town.
Consumer Unit Cost FAQ
Is a consumer unit cheaper than a rewire?+
Usually, if cables test sound. Both remain POA until surveyed.
Does the quote include certification?+
Yes — the agreed consumer unit works include the relevant BS 7671 certificate.
Quote for Consumer Unit Cost
Price on application after scope. No catalogue fee. Stockport base, with North West coverage and further travel quoted where the service is published.