Skip to main content
Commercial electrical · PPM

Commercial electrical maintenance planned visits, then a fault number

Maintenance is the diary that stops Friday-night board faults becoming the whole compliance plan.

This does not replace an EICR. Both can sit on the same estate with different dates.

What this commercial job is

Visits inspect the items on the contract: boards, RCDs, emergency circuits, lighting failures and small power. Findings go back as a short defect list.

Reactive attendance is quoted as a response, not disguised as a free extra. Multi-site clients get one schedule rather than four ad-hoc electricians.

Wider topic guide: Commercial electrical maintenance guide.

On the visit

  • ✓ PPM visits on an agreed list
  • ✓ Defects written for the FM file
  • ✓ Reactive route with a stated response
  • ✓ One diary across several postcodes

Questions facilities teams ask

Does PPM include a new EICR?

Only if the contract says the periodic inspection is in scope.

Can you attend a retail park after close?

Yes. Access hours are part of the quote.

Who do we call at 7am?

Contract sites get the fault route written on the schedule, not a generic inbox.

Related commercial jobs

Price on application

Quote Commercial electrical maintenance

Tell us the building, the kit you already have, and whether this is a one-off or a portfolio round. We price after that scope — not from a national grid.

By submitting you agree to our Privacy Policy and Terms.

💬
Call 07517806082 Free quote