AOV Commissioning
AOV commissioning proves that every vent, actuator, panel function and fire-alarm interface works as designed before the system is relied upon. iComply commission new and refurbished AOV installations across the North West, delivering cause-and-effect testing, backup-power checks and handover packs that landlords, clerks of works and building control expect.
About AOV Commissioning
AOV commissioning proves that every vent, actuator, panel function and fire-alarm interface works as designed before the system is relied upon. iComply commission new and refurbished AOV installations across the North West, delivering cause-and-effect testing, backup-power checks and handover packs that landlords, clerks of works and building control expect.
Commissioning includes verification of free-area equipment as installed, full open/close timing, manual control points, battery autonomy under load, and integration tests with detection or fire-alarm outputs. Snags are listed and closed before final sign-off. We also re-commission after major alterations or panel changes so records stay valid. Stockport-based engineers attend Greater Manchester projects and regional sites with clear day-rate or fixed commissioning packages.
- ●Full functional and cause-and-effect commissioning
- ●Battery autonomy and mains-fail proving
- ●Snagging lists closed before handover
- ●Documentation for building control and clients
Part of our AOV & Smoke Control service · Related: AOV Installation



Brands we install & service
Click a manufacturer for products, kits and install quotes related to AOV & Smoke Control and AOV Commissioning.
AOV Commissioning by area
Local landing pages for every town we cover (269 areas) — e.g. AOV Commissioning in Stockport.
Related AOV & Smoke Control guides
More topics under the same service — each also has pages for every Greater Manchester town.
AOV Commissioning FAQ
When is AOV commissioning required?+
After new installation, major modification, significant repair or when taking over a system with incomplete records.
Who should attend commissioning?+
Ideally the installer, fire-alarm specialist if separate, and a client representative — we coordinate multi-trade tests.
What documents do you leave on site?+
Test results, cause-and-effect matrix confirmation, battery/PSU notes and user guidance for the responsible person.
Quote for AOV Commissioning
Price on application after scope. No catalogue fee. Stockport base, with North West coverage and further travel quoted where the service is published.