Every type of bathroom fitting job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Full bathroom fits
A complete new bathroom from strip-out to finish, including plumbing, electrics, tiling and a clean, watertight result.
- When you need it
- Your bathroom is dated, leaking or the layout no longer works.
- What's involved
- Old suite removed, pipework and electrics adjusted, new suite fitted, walls tiled and everything sealed and tested.
- How long it takes
- Often one to two weeks.
- Who it's for
- Domestic full bathroom fits
Wet rooms
Level-access showering areas built with full tanking and a sloped floor, giving a modern look and easy access.
- When you need it
- You want a step-free shower or a more open bathroom.
- What's involved
- Floor prepared and laid to falls, drain fitted, walls and floor tanked, then tiled and sealed.
- How long it takes
- Often one to two weeks.
- Who it's for
- Domestic and commercial wet rooms
Shower installations
New electric, mixer or power showers fitted with trays, enclosures and safe electrics for a reliable everyday shower.
- When you need it
- Your shower is failing or you want one added over a bath or in a new space.
- What's involved
- Supplies run or adjusted, shower, tray and enclosure fitted, electrics tested and seals applied.
- How long it takes
- Usually one to two days.
- Who it's for
- Domestic shower installations
Accessible bathrooms
Bathrooms adapted for reduced mobility with level-access showers, grab rails and raised toilets to make daily use safer.
- When you need it
- Someone in the home has mobility needs or you are adapting a property for care.
- What's involved
- Layout planned, level-access shower, rails and accessible fittings installed and finishes sealed.
- How long it takes
- Often one to two weeks.
- Who it's for
- Domestic and commercial accessible bathrooms
En-suite installations
En-suite shower rooms created in bedrooms or box rooms, with plumbing, extraction and electrics included.
- When you need it
- You want a private shower room off a bedroom.
- What's involved
- Space planned, stud wall built, waste and supplies run, suite fitted, tiled and extraction added.
- How long it takes
- Often one to two weeks.
- Who it's for
- Domestic en-suite installations
Bath to shower conversions
Baths removed and replaced with walk-in or tray showers for easier, quicker everyday washing.
- When you need it
- Getting in and out of the bath is difficult or you rarely use it.
- What's involved
- Bath removed, tray or level base fitted, shower and enclosure installed and walls tiled.
- How long it takes
- Usually two to four days.
- Who it's for
- Domestic bath to shower conversions
Downstairs toilet installation
Cloakroom toilets and basins fitted in under-stairs spaces or small rooms, with waste and ventilation sorted.
- When you need it
- You want an extra toilet downstairs.
- What's involved
- Waste route planned, pipework run, toilet and basin fitted and extraction added.
- How long it takes
- Often two to five days.
- Who it's for
- Domestic downstairs toilet installation
Bathroom extractor fans
Extractor fans fitted or replaced to clear steam and moisture and help prevent condensation and mould.
- When you need it
- Your bathroom has mould, condensation or no working fan.
- What's involved
- Fan position chosen, hole cored, ducting run, fan wired and tested.
- How long it takes
- Usually half a day.
- Who it's for
- Domestic and commercial bathroom extractor fans
Toilet and basin replacement
Old or cracked toilets and basins swapped for new ones and reconnected without leaks.
- When you need it
- Your toilet or basin is cracked, leaking or dated.
- What's involved
- Old items removed, new toilet and basin fitted, connected and sealed.
- How long it takes
- Usually half a day.
- Who it's for
- Domestic and commercial toilet and basin replacement
Leaking shower repairs
Leaking showers traced and repaired, from failed seals and grout to trays and hidden pipework.
- When you need it
- Water is coming through a ceiling or stains appear around the shower.
- What's involved
- Leak source found, failed seals, grout, tray or pipework repaired and the shower tested.
- How long it takes
- Usually half a day to a day.
- Who it's for
- Domestic and commercial leaking shower repairs