Every type of loft conversions job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Dormer conversions
Dormer loft conversions that add headroom and floor space, turning the loft into a usable bedroom or office.
- When you need it
- You need an extra bedroom or office and the loft has enough height to work with.
- What's involved
- Structure designed, roof opened up, dormer framed and covered, floor strengthened, then insulated, boarded and finished.
- How long it takes
- Often six to eight weeks.
- Who it's for
- Domestic dormer conversions
Velux conversions
Roof light loft conversions that keep the existing roof shape, adding a room with less structural work and disruption.
- When you need it
- The loft has good head height and you want a room without changing the roof line.
- What's involved
- Floor strengthened, roof windows fitted between rafters, roof insulated, walls and ceiling boarded and stairs added.
- How long it takes
- Often four to six weeks.
- Who it's for
- Domestic velux conversions
Loft electrics and alarms
Lighting, sockets and interlinked smoke alarms installed in new loft rooms, then tested and certified.
- When you need it
- A loft is being converted and needs power, lighting and fire detection.
- What's involved
- Cables run at first fix, alarms interlinked through the house, fittings connected at second fix, then tested and certified.
- How long it takes
- Usually two to three days across the build.
- Who it's for
- Domestic loft electrics and alarms
Loft stairs
Fixed staircases built into loft conversions, positioned to keep good headroom and a safe route down.
- When you need it
- A loft room needs permanent access that works with the floor below.
- What's involved
- Position and headroom checked, opening trimmed, stair made or fitted, then balustrades and handrails added.
- How long it takes
- Usually one to three days.
- Who it's for
- Domestic loft stairs
Hip to gable conversions
Hipped roofs extended out to a full gable end, creating the space needed for a full-size loft room.
- When you need it
- A hipped roof leaves too little floor area for a usable loft room.
- What's involved
- Hip removed, gable wall built up, new roof section framed and covered, then the loft converted inside.
- How long it takes
- Often eight to ten weeks with the full conversion.
- Who it's for
- Domestic hip to gable conversions
Mansard conversions
Mansard loft conversions that rebuild a roof slope almost vertically, giving the most space, often on terraced homes.
- When you need it
- You want the largest possible loft room and planning allows it.
- What's involved
- Roof structure replaced on the chosen side, steep slope framed and clad, then floor, insulation and fit-out completed.
- How long it takes
- Often ten to twelve weeks.
- Who it's for
- Domestic mansard conversions
Protected stairway upgrades
Fire doors and a protected stair route fitted, so people on upper floors can get out safely if there is a fire.
- When you need it
- A loft conversion creates a new storey and the escape route down needs protecting.
- What's involved
- Doors onto the stairway upgraded to fire doors, walls and ceilings around the stair checked, and gaps fire-stopped.
- How long it takes
- Usually one to two days.
- Who it's for
- Domestic protected stairway upgrades
Loft en suites
Shower rooms and en suites built into loft conversions, with pumped or gravity waste to suit the layout.
- When you need it
- A loft bedroom needs its own shower room or toilet.
- What's involved
- Layout planned around head height, waste and supplies run, room boarded and waterproofed, and fittings installed.
- How long it takes
- Usually one to two weeks within the build.
- Who it's for
- Domestic loft en suites
Loft storage boarding
Raised boarding laid over loft insulation, giving safe storage space without squashing the insulation underneath.
- When you need it
- You want to use the loft for storage without converting it.
- What's involved
- Raised legs fixed to joists, boards laid over full-depth insulation, with a hatch and light added if needed.
- How long it takes
- Usually a day.
- Who it's for
- Domestic loft storage boarding
Loft conversion drawings
Measured surveys, drawings and structural calculations prepared, so a loft conversion can go through planning and building control.
- When you need it
- You are considering a loft conversion and need to know what is possible.
- What's involved
- Loft measured, options discussed, drawings and structural details prepared, and applications submitted.
- How long it takes
- The survey takes a few hours; drawings usually follow within a few weeks.
- Who it's for
- Domestic loft conversion drawings