Every type of first fix electrical job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Extension first fix
Cables and boxes before plastering.
- When you need it
- An extension is at stud or blockwork stage and needs cables in before plastering.
- What's involved
- Circuits planned, cables run and clipped, back boxes and drops set out ready for the plasterer.
- How long it takes
- Usually one to two days.
- Who it's for
- Domestic and commercial extension first fix
Renovation first fix
Rewiring stripped-out properties.
- When you need it
- A property has been stripped out for refurbishment and needs rewiring.
- What's involved
- Old wiring removed, new circuits run to an agreed plan and boxes fixed, ready for plaster.
- How long it takes
- Often two to four days for a house.
- Who it's for
- Domestic and commercial renovation first fix
New-build first fix
Working to drawings and builders' programmes.
- When you need it
- A new-build project is ready for electrical first fix to the builder's programme.
- What's involved
- Drawings followed, containment and cables installed, boxes and drops fitted, working around other trades.
- How long it takes
- Depends on the build, often several days per plot.
- Who it's for
- Domestic and commercial new-build first fix
Second fix and certification
Accessories fitted, tested and certified.
- When you need it
- Plastering is finished and accessories, lights and the consumer unit need fitting.
- What's involved
- Sockets, switches, lights and consumer unit fitted, every circuit tested and a certificate issued.
- How long it takes
- Usually one to two days for a house.
- Who it's for
- Domestic, commercial and industrial second fix and certification
Containment and trunking installation
Cable tray, basket, trunking and conduit installed to drawings, keeping cable routes neat, protected and easy to extend later.
- When you need it
- A commercial or industrial project needs cable routes before wiring starts.
- What's involved
- Routes set out from drawings, supports fixed, tray, trunking or conduit installed and earthed where needed.
- How long it takes
- Often several days, depending on the size of the job.
- Who it's for
- Commercial and industrial containment and trunking installation
Commercial fit-out first fix
First fix wiring for office, shop and unit fit-outs, coordinated around ceilings, partitions and the other trades on site.
- When you need it
- An office, shop or unit is being fitted out and needs power, lighting and data routes.
- What's involved
- Drawings reviewed, containment and cables run to each position, drops left for partitions and ceilings.
- How long it takes
- Usually a few days, depending on floor area.
- Who it's for
- Commercial commercial fit-out first fix
Loft conversion first fix
Cables, back boxes and lighting points for loft conversions, run before boarding and plastering so the finish stays clean.
- When you need it
- A loft conversion is at the stud stage and ready for electrics.
- What's involved
- Circuits planned, cables run through joists and studs, boxes and lighting points set out and recorded.
- How long it takes
- Usually one to two days.
- Who it's for
- Domestic loft conversion first fix
Kitchen and bathroom first fix
Wiring for new kitchens and bathrooms, with circuits, boxes and drops in place before units, tiling and plastering.
- When you need it
- A kitchen or bathroom is stripped out and ready for new wiring.
- What's involved
- Layout agreed, cooker, appliance, lighting and extractor circuits run, boxes fixed at the right heights.
- How long it takes
- Usually a day.
- Who it's for
- Domestic kitchen and bathroom first fix
Data and alarm cabling
Running data, TV, alarm and door entry cables at first fix so later systems go in without chasing finished walls.
- When you need it
- A build or refurbishment needs network, TV, alarm or door entry cabling before plastering.
- What's involved
- Cable routes planned, cables run to each point, labelled and left coiled ready for second fix.
- How long it takes
- Usually a day for a house.
- Who it's for
- Domestic and commercial data and alarm cabling
Temporary site supplies
Temporary power and lighting for building sites so trades can work safely before the permanent supply is ready.
- When you need it
- A build or refurbishment needs safe power and lighting before permanent wiring is complete.
- What's involved
- Site distribution board, sockets and lighting installed, tested and checked at regular intervals.
- How long it takes
- Usually a day to set up.
- Who it's for
- Domestic, commercial and industrial temporary site supplies