Every type of structured cabling job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Cat6 and Cat6A cabling
Tested and labelled data points.
- When you need it
- You need new data points for desks, phones or equipment.
- What's involved
- Cables run in containment, terminated at faceplates and patch panels, then tested and labelled.
- How long it takes
- Often one to three days, depending on point count.
- Who it's for
- Domestic, commercial and industrial cat6 and Cat6A cabling
Fibre links
Linking buildings and floors with fibre.
- When you need it
- Buildings or floors are too far apart for copper cabling.
- What's involved
- Fibre run between cabinets, terminated, tested and patched into the switches.
- How long it takes
- Usually one to two days.
- Who it's for
- Commercial and industrial fibre links
Cabinets and patching
New cabinets, patch panels and tidy patching.
- When you need it
- You need a new comms cabinet or the existing one is overloaded.
- What's involved
- Cabinet fitted, patch panels and cable management installed and leads patched neatly.
- How long it takes
- Usually a day.
- Who it's for
- Commercial and industrial cabinets and patching
CCTV and access point cabling
Cabling for cameras and Wi-Fi.
- When you need it
- You are adding cameras or Wi-Fi access points.
- What's involved
- Cables run to each camera or access point position, terminated and tested back to the switch.
- How long it takes
- Usually one to two days, depending on positions.
- Who it's for
- Domestic, commercial and industrial CCTV and access point cabling
Cable testing and certification
Existing data cabling tested end to end, with results showing each link performs as it should.
- When you need it
- You need proof that cabling works or suspect faulty links.
- What's involved
- Each link tested with a cable analyser, faults noted and a test report issued.
- How long it takes
- Usually half a day to a day.
- Who it's for
- Commercial and industrial cable testing and certification
Office relocation cabling
Data cabling planned and installed at your new premises so desks, phones and printers work on moving day.
- When you need it
- You are moving office or rearranging the layout.
- What's involved
- Layout planned, cabling and cabinet installed before the move and connections tested.
- How long it takes
- Often two to five days, depending on size.
- Who it's for
- Commercial office relocation cabling
Redundant cable removal
Old, unused data and phone cabling stripped out to clear ceilings and cabinets and reduce fire load.
- When you need it
- Ceilings and risers are full of dead cables from past installs.
- What's involved
- Live cables identified and labelled, redundant cables traced and removed, and containment tidied.
- How long it takes
- Often one to three days.
- Who it's for
- Commercial and industrial redundant cable removal
Cable tray and trunking
Cable tray, basket and trunking installed to carry cables neatly and safely through buildings.
- When you need it
- New cabling needs a proper route or existing cables are loose.
- What's involved
- Routes set out, containment fixed to walls and ceilings and cables dressed in.
- How long it takes
- Usually one to three days.
- Who it's for
- Commercial and industrial cable tray and trunking
Access control cabling
Cabling for door entry, access control readers, locks and exit buttons run and terminated ready for connection.
- When you need it
- You are fitting door entry or access control to doors.
- What's involved
- Cables run from each door to the controller, terminated, tested and labelled.
- How long it takes
- Usually one to two days.
- Who it's for
- Commercial and industrial access control cabling
Home data cabling
Wired data points run to rooms for TVs, home offices and Wi-Fi for faster, more reliable connections.
- When you need it
- Wi-Fi is not enough for streaming, gaming or working from home.
- What's involved
- Routes planned, cables run with minimal disruption, sockets fitted and links tested.
- How long it takes
- Usually a day.
- Who it's for
- Domestic home data cabling