Every type of roofing job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Roof repairs
Slipped and broken slates or tiles replaced and leaks traced, keeping water out before damage spreads inside.
- When you need it
- A leak appears, tiles have slipped or storm damage is visible.
- What's involved
- Roof inspected, leak source found, damaged tiles or slates replaced, and flashings or felt repaired where needed.
- How long it takes
- Often a few hours to a day.
- Who it's for
- Domestic, commercial and industrial roof repairs
Flat roofs
Flat roofs replaced in felt, rubber or fibreglass, with falls and outlets that shed water properly.
- When you need it
- A flat roof leaks, holds standing water or has blistered and cracked.
- What's involved
- Old covering stripped, deck checked and replaced where rotten, insulation and new membrane laid, and edges and outlets finished.
- How long it takes
- Often one to three days.
- Who it's for
- Domestic, commercial and industrial flat roofs
Guttering
Gutters and downpipes cleared, repaired or replaced, so rainwater runs away properly instead of soaking the walls.
- When you need it
- Gutters overflow, leak at the joints, sag or are blocked with debris.
- What's involved
- Gutters cleared, joints resealed or brackets reset, and damaged lengths or whole runs replaced to fall.
- How long it takes
- Usually half a day to a day.
- Who it's for
- Domestic, commercial and industrial guttering
Leadwork
Lead flashings, valleys and soakers fitted or renewed around chimneys, walls and roof junctions to stop leaks.
- When you need it
- Water gets in around a chimney, abutment or valley, or the lead is cracked or missing.
- What's involved
- Old lead removed, new lead cut and dressed to shape, fixed in place and pointed into the brickwork.
- How long it takes
- Usually a day.
- Who it's for
- Domestic and commercial leadwork
Pitched roof replacement
Worn-out pitched roofs stripped and recovered with new membrane, battens and tiles or slates, giving a sound, weathertight roof.
- When you need it
- Repairs keep failing, many tiles are slipping, or the roof is near the end of its life.
- What's involved
- Scaffold erected, old covering stripped, timbers checked, then new membrane, battens and tiles or slates laid and ridges fixed.
- How long it takes
- Often one to two weeks for a house.
- Who it's for
- Domestic and commercial pitched roof replacement
Chimney repairs
Chimney stacks repointed, rebuilt or capped, with flaunching and pots made safe and watertight again.
- When you need it
- Pointing is crumbling, a pot is loose, or damp shows on the chimney breast.
- What's involved
- Access set up, stack inspected, loose brickwork repointed or rebuilt, flaunching renewed and pots or caps fitted.
- How long it takes
- Usually one to two days, plus scaffold.
- Who it's for
- Domestic and commercial chimney repairs
Fascias and soffits
Rotten timber fascias and soffits replaced with low-maintenance boards, protecting the roof edge and supporting the gutters.
- When you need it
- Timber is rotten, paint is peeling, or gutters are pulling away.
- What's involved
- Gutters taken down, old boards removed, rafter ends checked, new boards fitted with vents, and gutters refitted.
- How long it takes
- Often one to two days.
- Who it's for
- Domestic and commercial fascias and soffits
Ridge and verge repairs
Loose ridge tiles and crumbling verge mortar rebedded or replaced with dry-fix systems, keeping the roof edges secure.
- When you need it
- Ridge tiles rock or have fallen, or mortar is dropping from the roof edges.
- What's involved
- Loose tiles lifted, old mortar cleaned off, then tiles rebedded in fresh mortar or a dry-fix system fitted.
- How long it takes
- Usually a day.
- Who it's for
- Domestic and commercial ridge and verge repairs
Roof inspections
Roof condition surveys with photos, so you know what needs doing now and what can wait.
- When you need it
- You are buying, managing a block, or want to plan maintenance before problems start.
- What's involved
- Roof checked from access equipment or by drone, coverings, flashings and gutters recorded, then a written summary provided.
- How long it takes
- Usually an hour or two on site.
- Who it's for
- Domestic, commercial and industrial roof inspections
Roof window installation
Roof windows fitted into pitched roofs with proper flashing kits, bringing daylight and ventilation into lofts and top floors.
- When you need it
- A loft, attic room or top floor is dark or needs ventilation.
- What's involved
- Opening cut between rafters, trimmers fitted, window and flashing installed, then the lining made good inside.
- How long it takes
- Usually a day per window.
- Who it's for
- Domestic and commercial roof window installation