Every type of electrical job: testing and certificates, rewires, consumer units, security lighting, three-phase supplies, machinery wiring and emergency call-outs, for domestic, commercial and industrial customers.
EICR (Electrical Installation Condition Report)
A full inspection and test of the fixed wiring, showing whether it is safe and what needs fixing.
- When you need it
- You have no report from the last five years; You are buying, selling or letting a property; Lights flicker or breakers trip.
- What's involved
- Book → Inspect and test → Report → Put it right.
- How long it takes
- Most flats and houses take two to four hours. Larger and commercial buildings are planned in advance.
- Who it's for
- Domestic, commercial and industrial EICR
Full details →Landlord EICR
The electrical safety report landlords must have for every rented home, with repairs sorted quickly.
- When you need it
- A new tenancy is starting; Your current report is due to expire; A previous report was unsatisfactory.
- What's involved
- Arrange access → Inspect and test → Report and quote → Confirm.
- How long it takes
- Usually two to four hours per property, with the report sent within a couple of days.
- Who it's for
- Domestic landlord EICR
Full details →Commercial fixed wire testing
Periodic inspection and testing of the fixed wiring in shops, offices, warehouses and factories.
- When you need it
- Your insurer has asked for a current report; You have taken on new premises; The building has been altered or extended.
- What's involved
- Plan → Test → Report → Repair.
- How long it takes
- From a day for a small shop to several days for large sites, planned to avoid disruption.
- Who it's for
- Commercial and industrial commercial fixed wire testing
Full details →PAT testing
Safety testing of plug-in appliances, with labels and an asset register.
- When you need it
- You have no test records; New equipment has been bought; You let a furnished property.
- What's involved
- Visual check → Test → Label → Register.
- How long it takes
- Most small offices are done in a few hours.
- Who it's for
- Domestic, commercial and industrial PAT testing
Full details →Electrical installation certificates
Certificates for new circuits, alterations and additions, so your work is properly signed off.
- When you need it
- You have had new electrical work done; You are selling and need paperwork; Building control has asked for certificates.
- What's involved
- Inspect → Test → Certify → Notify.
- How long it takes
- Issued on completion of the work.
- Who it's for
- Domestic, commercial and industrial electrical installation certificates
Full details →Thermal imaging inspections
Infrared surveys of distribution boards that find hot spots before they become fires.
- When you need it
- Your insurer requires thermographic surveys; Boards run warm or smell hot; Loads have increased.
- What's involved
- Survey → Analyse → Report → Fix.
- How long it takes
- Usually a few hours per site, with no power shutdown.
- Who it's for
- Commercial and industrial thermal imaging inspections
Full details →Consumer unit replacement
Replace an old fuse box with a modern consumer unit with full RCD protection.
- When you need it
- You have an old fuse box or wire fuses; Your EICR recommended an upgrade; Breakers trip for no clear reason.
- What's involved
- Pre-test → Swap → Test → Certify.
- How long it takes
- Usually half a day to a full day, with power off during the swap.
- Who it's for
- Domestic and commercial consumer unit replacement
Full details →Full house rewire
A complete rewire for older homes, with new circuits, sockets, lighting and a new consumer unit.
- When you need it
- Old rubber or fabric-covered cables; Very few sockets and lots of extension leads; Old round-pin sockets or brown switches.
- What's involved
- Plan → First fix → Second fix → Test and certify.
- How long it takes
- A typical three-bed house takes five to ten working days.
- Who it's for
- Domestic full house rewire
Full details →Partial rewires and new circuits
Rewire part of a property or add new circuits without a full rewire.
- When you need it
- One floor or area has old wiring; You need more power in the kitchen; An extension or outbuilding needs supply.
- What's involved
- Assess → Plan → Install → Certify.
- How long it takes
- From half a day for a single circuit to a few days for a floor.
- Who it's for
- Domestic and commercial partial rewires and new circuits
Full details →Extra sockets and USB points
New double sockets, USB sockets, outdoor sockets and floor boxes where you need them.
- When you need it
- Extension leads everywhere; Desk or TV area short of sockets; Need power in a garage or shed.
- What's involved
- Check → Install → Test → Certify.
- How long it takes
- Most single sockets take an hour or two.
- Who it's for
- Domestic and commercial extra sockets and USB points
Full details →Lighting installation and LED upgrades
New lights, LED downlights, pendants, under-cabinet and dimmable lighting.
- When you need it
- Dark rooms or old fittings; High lighting bills; Kitchen or bathroom refit.
- What's involved
- Design → Install → Test → Certify.
- How long it takes
- From an hour for a single fitting to a day or two for a whole house.
- Who it's for
- Domestic, commercial and industrial lighting installation and LED upgrades
Full details →Security and outdoor lighting
PIR floodlights, dusk-to-dawn lights, wall lights and car park lighting that keep property safe.
- When you need it
- Dark drive, path or yard; Break-ins or vandalism; Car park or loading bay needs lighting.
- What's involved
- Survey → Plan → Install → Set up.
- How long it takes
- Most homes take half a day; car parks and yards are planned per site.
- Who it's for
- Domestic, commercial and industrial security and outdoor lighting
Full details →Garden and outdoor electrics
Power and lighting for gardens, garages, sheds, garden rooms and outbuildings.
- When you need it
- New garden room or office; Garage or shed needs power; Hot tub or pond pump.
- What's involved
- Plan → Install → Connect → Certify.
- How long it takes
- Usually one to two days depending on distance and digging.
- Who it's for
- Domestic and commercial garden and outdoor electrics
Full details →Electric shower circuits
Dedicated circuits for new or upgraded electric showers.
- When you need it
- Fitting a new electric shower; Upgrading to a higher-power shower; Shower trips or isolator gets hot.
- What's involved
- Check → Install → Connect → Certify.
- How long it takes
- Usually half a day.
- Who it's for
- Domestic electric shower circuits
Full details →Cooker and hob circuits
Dedicated circuits and connections for ovens, hobs and range cookers.
- When you need it
- New induction hob; Range cooker installation; Kitchen refit.
- What's involved
- Check → Install → Connect → Certify.
- How long it takes
- Usually a few hours.
- Who it's for
- Domestic and commercial cooker and hob circuits
Full details →Kitchen and bathroom electrics
All the electrics for a kitchen or bathroom refit, from first fix to final certificate.
- When you need it
- Kitchen or bathroom refit; Not enough sockets on worktops; Moving appliances.
- What's involved
- Plan → First fix → Second fix → Certify.
- How long it takes
- Usually one to two days across first and second fix.
- Who it's for
- Domestic kitchen and bathroom electrics
Full details →Extractor fans
Bathroom, kitchen and utility extractor fans to control condensation and mould.
- When you need it
- Mould or condensation; Noisy or broken fan; Bathroom with no window.
- What's involved
- Assess → Install → Test → Certify.
- How long it takes
- Usually two to four hours.
- Who it's for
- Domestic and commercial extractor fans
Full details →Extension and loft conversion electrics
First and second fix electrics for extensions, loft conversions and garage conversions.
- When you need it
- Building an extension; Loft or garage conversion; Building control needs certificates.
- What's involved
- Plan → First fix → Second fix → Certify.
- How long it takes
- Spread across the build: usually two to four days on site.
- Who it's for
- Domestic extension and loft conversion electrics
Full details →Mains smoke and heat alarm wiring
Mains-powered, interlinked smoke, heat and carbon monoxide alarms.
- When you need it
- HMO or licensing requirement; Loft conversion or extension; Old alarms over ten years old.
- What's involved
- Plan → Install → Test → Certify.
- How long it takes
- Usually half a day for a house.
- Who it's for
- Domestic and commercial mains smoke and heat alarm wiring
Full details →Electric heating and storage heaters
Panel heaters, storage heaters, underfloor heating and heating controls.
- When you need it
- No gas supply; Old storage heaters; Cold rooms or conservatories.
- What's involved
- Survey → Plan → Install → Certify.
- How long it takes
- Usually one to two days for a flat.
- Who it's for
- Domestic and commercial electric heating and storage heaters
Full details →Smart home and smart switches
Smart lighting, switches, sockets, thermostats and video doorbells.
- When you need it
- Want app or voice control; Heating schedules; Video doorbell.
- What's involved
- Choose → Install → Set up → Handover.
- How long it takes
- Usually a few hours.
- Who it's for
- Domestic and commercial smart home and smart switches
Full details →Data, TV and network points
Wired network, TV and phone points where you need them.
- When you need it
- Poor Wi-Fi in some rooms; Home office set-up; TV on a new wall.
- What's involved
- Plan → Install → Test → Label.
- How long it takes
- Usually a few hours to a day.
- Who it's for
- Domestic and commercial data, TV and network points
Full details →EV charger circuits
Dedicated supplies for home and workplace EV chargers.
- When you need it
- New electric car; Charging from a 3-pin plug; Staff want workplace charging.
- What's involved
- Survey → Install → Set up → Certify.
- How long it takes
- Usually half a day.
- Who it's for
- Domestic and commercial EV charger circuits
Full details →Solar PV and battery connections
Electrical connections, isolation and board work for solar panels and home batteries.
- When you need it
- Adding a home battery; Solar system faults; Board needs upgrading for solar.
- What's involved
- Check → Install → Test → Certify.
- How long it takes
- Usually a day for the electrical works.
- Who it's for
- Domestic and commercial solar PV and battery connections
Full details →Surge protection
Surge protection devices that protect electronics from spikes on the supply.
- When you need it
- Expensive electronics or home office; Recent damage after a storm; Consumer unit upgrade planned.
- What's involved
- Assess → Install → Test → Certify.
- How long it takes
- Usually an hour or two.
- Who it's for
- Domestic, commercial and industrial surge protection
Full details →Earthing and bonding upgrades
Main earthing and protective bonding to gas and water pipes.
- When you need it
- EICR flagged missing bonding; New gas or water pipework; Old or undersized earth cable.
- What's involved
- Test → Upgrade → Label → Certify.
- How long it takes
- Usually a few hours.
- Who it's for
- Domestic and commercial earthing and bonding upgrades
Full details →Three-phase supplies and distribution boards
Three-phase power, distribution boards and sub-mains for workshops, factories and commercial buildings.
- When you need it
- New machinery needs three-phase; Boards are full or overloaded; Phases are unbalanced.
- What's involved
- Survey → Design → Install → Test and certify.
- How long it takes
- From a day for a board change to several days for new sub-mains.
- Who it's for
- Commercial and industrial three-phase supplies and distribution boards
Full details →Machinery wiring and isolation
Supplies, isolators, emergency stops and control wiring for machines.
- When you need it
- New or relocated machinery; No local isolation; Emergency stops needed.
- What's involved
- Survey → Install → Commission → Certify.
- How long it takes
- Usually a day per machine, planned around production.
- Who it's for
- Industrial and commercial machinery wiring and isolation
Full details →Commercial and warehouse LED lighting
LED upgrades for offices, shops, warehouses and car parks, with sensors and emergency lighting.
- When you need it
- High electricity bills; Old fluorescent or sodium fittings; Dark warehouse or yard.
- What's involved
- Survey → Design → Install → Certify.
- How long it takes
- From a day for a small office to a week for a large warehouse.
- Who it's for
- Commercial and industrial commercial and warehouse LED lighting
Full details →Shop, office and unit electrical installations
Complete electrical installations for fit-outs, refurbishments and new units.
- When you need it
- New lease or fit-out; Office reconfiguration; Change of use.
- What's involved
- Design → Install → Commission → Handover.
- How long it takes
- Planned per project.
- Who it's for
- Commercial and industrial shop, office and unit electrical installations
Full details →Planned electrical maintenance
Scheduled electrical maintenance for commercial and industrial sites.
- When you need it
- Unplanned outages; Several contractors to manage; Insurer requirements.
- What's involved
- Asset survey → Schedule → Deliver → Respond.
- How long it takes
- Ongoing contract.
- Who it's for
- Commercial and industrial planned electrical maintenance
Full details →