Every type of kitchen fitting job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Full kitchen fits
A complete new kitchen fitted from strip-out to finish, with units, worktops, plumbing, electrics and tiling handled by one team.
- When you need it
- Your kitchen is worn out or the layout no longer works.
- What's involved
- Old kitchen removed, services adjusted, units and worktops fitted, appliances connected and walls tiled.
- How long it takes
- Often one to two weeks, depending on size.
- Who it's for
- Domestic full kitchen fits
Worktop and door replacement
New worktops and cupboard doors fitted to sound existing units, giving a fresh look without the cost of a full refit.
- When you need it
- Your units are solid but the worktops or doors look tired.
- What's involved
- Old worktops and doors removed, new ones cut and fitted, sink and hob refitted and edges sealed.
- How long it takes
- Usually one to two days.
- Who it's for
- Domestic worktop and door replacement
Kitchen electrics and plumbing
Sockets, cooker circuits, lighting, sinks and appliance supplies installed or moved so the kitchen works safely.
- When you need it
- You are changing the layout or adding appliances that need new supplies.
- What's involved
- Circuits and pipework run or moved, appliances connected, tested and certificates issued for the electrical work.
- How long it takes
- Usually one to two days.
- Who it's for
- Domestic and commercial kitchen electrics and plumbing
Rental kitchen refreshes
Hard-wearing, affordable kitchen updates for rental properties that help a property let quickly and stand up to tenants.
- When you need it
- A rental kitchen is dated or damaged between tenancies.
- What's involved
- Doors, worktops, taps or units replaced as needed, sealed and the kitchen cleaned ready for letting.
- How long it takes
- Usually two to four days.
- Who it's for
- Domestic rental kitchen refreshes
Kitchen design and planning
Layouts planned around how you cook and live, with units, appliances and services positioned before fitting starts.
- When you need it
- You are planning a new kitchen and want the layout right first.
- What's involved
- Room measured, layout and unit options drawn up, services planned and the design agreed.
- How long it takes
- Usually a visit plus a few days for drawings.
- Who it's for
- Domestic kitchen design and planning
Integrated appliance fitting
Built-in ovens, hobs, dishwashers and fridges fitted into units and connected safely.
- When you need it
- You have new integrated appliances or are replacing old ones.
- What's involved
- Units adjusted, appliances fitted and connected to power, water and waste, then tested.
- How long it takes
- Usually a few hours.
- Who it's for
- Domestic integrated appliance fitting
Extractor fan installation
Cooker hoods and kitchen extractor fans fitted and ducted outside to clear steam, smells and moisture.
- When you need it
- Your kitchen gets steamy or has condensation and mould.
- What's involved
- Hood or fan fitted, ducting run through the wall or ceiling, wired and tested.
- How long it takes
- Usually half a day.
- Who it's for
- Domestic and commercial extractor fan installation
Kitchen lighting
Under-cabinet, ceiling and plinth lighting fitted to make worktops easier to use and the kitchen more inviting.
- When you need it
- Your kitchen is dark or you are fitting new units.
- What's involved
- Lighting positions agreed, cables run, fittings installed and the circuit tested.
- How long it takes
- Usually half a day to a day.
- Who it's for
- Domestic kitchen lighting
Utility room fitting
Utility rooms fitted with units, worktops, sinks and washing machine connections to free up kitchen space.
- When you need it
- You want laundry and storage out of the kitchen.
- What's involved
- Units and worktops fitted, sink and appliance supplies run and connections tested.
- How long it takes
- Usually two to three days.
- Who it's for
- Domestic utility room fitting
Sink and tap replacement
Kitchen sinks and taps replaced and reconnected with no leaks, including worktop cut-outs where needed.
- When you need it
- Your sink is damaged, your tap drips or you want an upgrade.
- What's involved
- Old sink and tap removed, cut-out adjusted, new ones fitted, plumbed in and leak tested.
- How long it takes
- Usually a few hours.
- Who it's for
- Domestic sink and tap replacement