Every type of plastering job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Skimming
A thin finishing coat over existing walls or ceilings that gives a smooth surface ready for decorating.
- When you need it
- Walls or ceilings are uneven, cracked or patchy.
- What's involved
- Surfaces prepared, edges beaded where needed, skim coat applied and polished to a smooth finish.
- How long it takes
- Usually a day per room.
- Who it's for
- Domestic and commercial skimming
Patch repairs
Holes, cracks and blown plaster repaired and blended in so walls look whole again without a full replaster.
- When you need it
- You have damaged areas after leaks, knocks or old fixings.
- What's involved
- Loose plaster removed, area filled and built up, then skimmed and feathered into the surrounding wall.
- How long it takes
- Usually a few hours to a day.
- Who it's for
- Domestic and commercial patch repairs
Ceiling boarding
Old or damaged ceilings overboarded or replaced with new plasterboard and skimmed for a flat, sound finish.
- When you need it
- A ceiling is sagging, cracked or has been damaged by water.
- What's involved
- Ceiling made safe, boards fixed to joists, joints taped and the whole ceiling skimmed.
- How long it takes
- Usually one to two days per room.
- Who it's for
- Domestic and commercial ceiling boarding
Making good after rewires
Chases, socket boxes and holes left by electrical work filled and finished so rooms are ready to decorate.
- When you need it
- A rewire or new wiring has left chases and holes in walls.
- What's involved
- Chases filled in layers, boxes and holes made good, then skimmed flush with the wall.
- How long it takes
- Usually one to two days per property.
- Who it's for
- Domestic and commercial making good after rewires
Full replastering
Old, blown or crumbling plaster hacked off and walls replastered from scratch for a solid, flat finish.
- When you need it
- Plaster is loose, hollow or crumbling across large areas.
- What's involved
- Old plaster removed, walls prepared, backing coat applied, then finished with a skim coat.
- How long it takes
- Usually two to three days per room.
- Who it's for
- Domestic and commercial full replastering
Dot and dab boarding
Plasterboard bonded directly to masonry walls with adhesive for a quick, flat surface ready for skimming.
- When you need it
- Walls are too uneven to skim or you need a fast finish.
- What's involved
- Adhesive dabs applied, boards pressed and levelled, joints taped and walls skimmed.
- How long it takes
- Usually one to two days per room.
- Who it's for
- Domestic and commercial dot and dab boarding
Textured ceiling covering
Old textured or swirled ceilings covered with a smooth plaster finish for a modern look.
- When you need it
- You have a textured ceiling and want it flat and smooth.
- What's involved
- Ceiling checked and sampled where needed, prepared, then skimmed or overboarded and skimmed.
- How long it takes
- Usually a day per room.
- Who it's for
- Domestic textured ceiling covering
Coving installation
Plaster coving fitted where walls meet ceilings to hide cracks and give rooms a finished look.
- When you need it
- You want to cover cracks along the ceiling line or add a traditional detail.
- What's involved
- Coving measured and mitred, fixed with adhesive, joints filled and finished ready for painting.
- How long it takes
- Usually half a day per room.
- Who it's for
- Domestic coving installation
Fire-rated boarding
Fire-rated plasterboard fitted to walls, ceilings and boxing to help hold back the spread of fire.
- When you need it
- Works require fire separation, such as in HMOs, flats or around stairs.
- What's involved
- Fire-rated boards fixed in the right layers, joints sealed and filled, then skimmed.
- How long it takes
- Usually one to two days, depending on area.
- Who it's for
- Domestic and commercial fire-rated boarding
Plastering after damp treatment
Walls replastered with suitable plaster after damp works so the finish stays sound and dries out properly.
- When you need it
- A damp course or damp treatment has been carried out and walls need making good.
- What's involved
- Damaged plaster removed, walls treated as specified, suitable plaster applied and skimmed.
- How long it takes
- Usually one to two days per room.
- Who it's for
- Domestic plastering after damp treatment