Load-bearing wall removal
Removing a load-bearing wall and installing a steel beam to carry the load.
- When you need it
- You want to join rooms or create an open-plan layout.
- What's involved
- Calculations and approval arranged, structure propped, wall removed, steel and padstones installed, inspected and made good.
- How long it takes
- Usually one to two weeks.
- Who it's for
- Domestic and commercial load-bearing wall removal

