Every type of insulation job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Loft insulation
Loft insulation topped up or replaced to a good depth, cutting the heat lost through the roof.
- When you need it
- The loft has thin, patchy or old insulation, or upstairs rooms are cold.
- What's involved
- Loft cleared, wiring checked, insulation rolled between and over the joists, and the hatch and pipes insulated.
- How long it takes
- Usually half a day to a day.
- Who it's for
- Domestic and commercial loft insulation
Cavity wall insulation
Empty cavity walls filled with insulation through small drilled holes, reducing heat loss with little disruption inside.
- When you need it
- Walls have an unfilled cavity and the house feels cold or bills are high.
- What's involved
- Walls surveyed for suitability, holes drilled in a set pattern, insulation injected and holes made good to match.
- How long it takes
- Usually a day.
- Who it's for
- Domestic and commercial cavity wall insulation
Internal wall insulation
Insulated boards or studwork fitted to the inside of solid walls, warming rooms without changing the outside.
- When you need it
- The house has solid walls and the outside cannot or should not be changed.
- What's involved
- Fittings removed, insulation and vapour control fixed to walls, boarded and plastered, then fittings refitted.
- How long it takes
- Often one to two days per room.
- Who it's for
- Domestic and commercial internal wall insulation
Floor insulation
Insulation fitted under suspended timber floors or into new solid floors, stopping cold and draughts coming up from below.
- When you need it
- Floors feel cold or draughty, or a floor is being replaced.
- What's involved
- Boards lifted or access gained from below, insulation fitted between joists with a membrane, then boards relaid.
- How long it takes
- Often a day or two per room.
- Who it's for
- Domestic and commercial floor insulation
External wall insulation
Insulation boards fixed to outside walls and finished in render, cutting heat loss without taking space from inside.
- When you need it
- Solid walls lose heat and you would rather not lose room space to internal insulation.
- What's involved
- Walls prepared, boards bonded and mechanically fixed, mesh and basecoat applied, then a render finish.
- How long it takes
- Often one to two weeks for a house.
- Who it's for
- Domestic and commercial external wall insulation
Room in roof insulation
Sloping ceilings, dwarf walls and flat sections of attic rooms insulated, so they are not freezing in winter or stifling in summer.
- When you need it
- An attic room is cold in winter and too hot in summer.
- What's involved
- Linings opened up or overboarded, insulation fitted to slopes, walls and ceilings, then boarded and finished.
- How long it takes
- Often two to four days.
- Who it's for
- Domestic room in roof insulation
Flat roof insulation
Insulation added to flat roofs as a warm deck build-up, usually when the roof covering is being replaced.
- When you need it
- A room under a flat roof is cold, or the roof covering is due for replacement.
- What's involved
- Covering stripped, vapour control layer and insulation boards laid, then a new waterproof membrane fitted.
- How long it takes
- Often one to three days.
- Who it's for
- Domestic and commercial flat roof insulation
Acoustic insulation
Sound insulation fitted in floors, walls and ceilings to cut down noise between rooms and neighbouring flats.
- When you need it
- Noise from neighbours, upstairs or between rooms is a problem.
- What's involved
- Area opened up, acoustic insulation and resilient bars or boards fitted, then reboarded and finished.
- How long it takes
- Often one to three days.
- Who it's for
- Domestic and commercial acoustic insulation
Pipe and tank lagging
Pipes and tanks in lofts, voids and outbuildings lagged to reduce heat loss and the risk of freezing.
- When you need it
- Pipes run through cold spaces or have frozen before.
- What's involved
- Pipe runs and tanks located, sized lagging fitted and taped, and insulated covers added to tanks.
- How long it takes
- Usually a few hours.
- Who it's for
- Domestic, commercial and industrial pipe and tank lagging
Draught proofing
Gaps around doors, windows, floors and loft hatches sealed, stopping draughts while keeping the ventilation the building needs.
- When you need it
- Rooms feel draughty even with the heating on.
- What's involved
- Draught paths found, seals and strips fitted to doors and windows, gaps sealed, and vents left clear.
- How long it takes
- Usually half a day to a day.
- Who it's for
- Domestic and commercial draught proofing