Every type of fire compartmentation job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Compartmentation surveys
Finding breaches in walls, floors and ceilings.
- When you need it
- Your fire risk assessment recommends a survey, or building works may have breached fire walls.
- What's involved
- Ceilings, voids, risers and walls inspected or opened up, breaches photographed and marked on plans, report issued.
- How long it takes
- Usually one to several days, depending on the building.
- Who it's for
- Domestic, commercial and industrial compartmentation surveys
Remedial works
Fire stopping and boarding repairs.
- When you need it
- A survey or assessment has found breaches in walls, floors or ceilings.
- What's involved
- Breaches sealed with tested fire stopping, damaged boarding repaired, and every repair photographed and labelled.
- How long it takes
- Often several days, depending on the findings.
- Who it's for
- Domestic, commercial and industrial remedial works
Drawings and records
Marked-up plans for your building file.
- When you need it
- You have no plans showing fire compartments, or need records for your building file.
- What's involved
- Compartment lines, fire-rated walls and doors marked on floor plans and cross-referenced to photos.
- How long it takes
- Usually a few days, including survey and drawing time.
- Who it's for
- Domestic, commercial and industrial drawings and records
Cavity barrier installation
Fitting cavity barriers in ceiling voids, roof spaces and wall cavities to stop fire and smoke spreading unseen.
- When you need it
- Voids or cavities run across compartment lines with no barriers in place.
- What's involved
- Void layout checked, barriers sized and fixed tight to the structure, gaps sealed and photographed.
- How long it takes
- Usually one to three days.
- Who it's for
- Domestic, commercial and industrial cavity barrier installation
Fire-rated boarding repairs
Repairing holes and damaged fire-rated plasterboard in walls and ceilings so they hold back fire as they were designed to.
- When you need it
- Walls or ceilings have holes, missing boards or damage from building work.
- What's involved
- Damaged area cut back, matching fire-rated board fitted, joints taped and sealed, then photographed.
- How long it takes
- Usually a few hours per area.
- Who it's for
- Domestic, commercial and industrial fire-rated boarding repairs
Fire-rated ceiling upgrades
Upgrading ceilings to give proper fire resistance between floors or over escape routes where the existing ceiling falls short.
- When you need it
- An assessment finds a ceiling is not fire-rated where the building relies on it.
- What's involved
- Existing ceiling checked, fire-rated boards or a tested ceiling system fitted, edges and service openings sealed.
- How long it takes
- Usually one to three days.
- Who it's for
- Domestic, commercial and industrial fire-rated ceiling upgrades
Loft and roof void separation
Building fire walls in shared lofts and roof voids so fire cannot spread across the roof between flats or houses.
- When you need it
- A loft or roof void runs over several flats or properties with no separation.
- What's involved
- Loft surveyed, a fire-rated board or block wall built up to the roof, and gaps around it sealed.
- How long it takes
- Usually one to three days.
- Who it's for
- Domestic and commercial loft and roof void separation
Conversion fire separation upgrades
Upgrading floors, walls and ceilings in converted houses and HMOs to give proper fire separation between rooms and flats.
- When you need it
- A house conversion, HMO licence or fire risk assessment calls for better fire separation.
- What's involved
- Existing separation checked, ceilings and walls upgraded with fire-rated boarding, gaps sealed and works recorded.
- How long it takes
- Often several days, depending on the property.
- Who it's for
- Domestic and commercial conversion fire separation upgrades
Post-works compartmentation checks
Checking walls, ceilings and voids after other contractors finish, so new breaches are found and sealed before they are hidden.
- When you need it
- Electrical, plumbing, data or refit work has passed through fire-rated walls or floors.
- What's involved
- Areas of work inspected, breaches photographed and logged, then sealed or listed for remedial work.
- How long it takes
- Usually a few hours to a day.
- Who it's for
- Domestic, commercial and industrial post-works compartmentation checks
Fire damper drop tests
Drop testing fire dampers in ductwork so they close fully and keep fire out of the next compartment.
- When you need it
- Fire dampers have no recent test record, or ductwork passes through fire walls.
- What's involved
- Access panels opened, each damper released, checked for full closure and reset, with findings recorded.
- How long it takes
- Usually under half an hour per damper, depending on access.
- Who it's for
- Commercial and industrial fire damper drop tests