Manhole installation
New manholes built or installed where drains join or change direction.
- When you need it
- New drainage needs an access point, or an existing junction has none.
- What's involved
- Excavation, base and chamber installed or built, channels and benching formed, cover and frame set to level, then tested.
- How long it takes
- Usually one to two days.
- Who it's for
- Domestic, commercial and industrial manhole installation

