Every type of resin & epoxy floor coatings job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Warehouse epoxy flooring
Heavy-duty epoxy coating for warehouse and distribution floors that stands up to forklifts and pallet trucks.
- When you need it
- The floor is dusting or wearing under forklifts and pallet trucks.
- What's involved
- Floor ground and repaired, primer and epoxy coats applied, cured and returned to use.
- How long it takes
- Usually two to five days, depending on area.
- Who it's for
- Commercial and industrial warehouse epoxy flooring
Garage floor coating
Hard-wearing resin coating for domestic and commercial garages, resisting oil and easy to sweep clean.
- When you need it
- You want a clean, oil-resistant floor that is easy to sweep.
- What's involved
- Concrete cleaned and ground, cracks filled, resin applied with optional flake finish.
- How long it takes
- Usually one to two days.
- Who it's for
- Domestic and commercial garage floor coating
Commercial kitchen flooring
Seamless, anti-slip resin floors with coved edges for commercial kitchens and food preparation areas.
- When you need it
- Your kitchen floor is tiled, cracked or hard to keep hygienic.
- What's involved
- Old floor prepared or removed, coving formed at walls, anti-slip resin laid around drains.
- How long it takes
- Usually two to four days.
- Who it's for
- Commercial commercial kitchen flooring
Workshop floor coating
Chemical- and oil-resistant floor coatings for workshops, garages and maintenance bays that see heavy use.
- When you need it
- Oil, fuel or chemicals are staining and damaging the floor.
- What's involved
- Contaminated concrete cleaned and ground, chemical-resistant coating applied in layers.
- How long it takes
- Usually two to three days.
- Who it's for
- Commercial and industrial workshop floor coating
Anti-slip resin flooring
Textured resin finishes for wet, oily or sloping floors where people are at risk of slipping.
- When you need it
- People are slipping in wash-down areas, ramps or entrances.
- What's involved
- Surface prepared, resin applied with anti-slip aggregate, top coat sealed.
- How long it takes
- Usually one to three days.
- Who it's for
- Domestic, commercial and industrial anti-slip resin flooring
Concrete floor repair
Repairing cracks, potholes and damaged joints in concrete slabs, either on their own or before coating.
- When you need it
- The slab has potholes, cracked joints or uneven areas.
- What's involved
- Damaged areas cut out, repair mortar laid, joints filled, surface ground level.
- How long it takes
- Usually one to two days.
- Who it's for
- Commercial and industrial concrete floor repair
Floor line marking
Painted or resin traffic routes, pedestrian walkways, storage bays and hazard markings for workplace floors.
- When you need it
- Forklifts and pedestrians share space, or layouts have changed.
- What's involved
- Layout agreed, lines set out, marking paint or resin applied and cured.
- How long it takes
- Usually a day.
- Who it's for
- Commercial and industrial floor line marking
Resin floor recoating
Refreshing a worn, scratched or dull epoxy floor with repairs and a new protective top coat.
- When you need it
- An existing resin floor is worn, scratched or dull.
- What's involved
- Surface cleaned and abraded, damaged patches repaired, new top coat applied.
- How long it takes
- Usually one to two days.
- Who it's for
- Commercial and industrial resin floor recoating
Self-levelling resin floors
Smooth, flat, seamless resin screeds for showrooms, laboratories, clean areas and production spaces.
- When you need it
- You need a level, seamless finish in a showroom, lab or production area.
- What's involved
- Floor primed, self-levelling resin poured and spread, cured and sealed.
- How long it takes
- Usually two to four days.
- Who it's for
- Commercial and industrial self-levelling resin floors
Dust-proof floor sealing
A clear sealer that stops concrete floors dusting, at lower cost than a full coloured coating.
- When you need it
- Concrete dust is getting onto stock or machinery.
- What's involved
- Floor cleaned, sealer applied in coats, allowed to dry before use.
- How long it takes
- Usually one to two days.
- Who it's for
- Commercial and industrial dust-proof floor sealing