Every type of rendering job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Silicone render
Thin coat silicone render applied over a basecoat and mesh, giving a coloured, water-repellent finish that resists staining.
- When you need it
- Walls look tired or patchy, or you want a modern, low-maintenance finish.
- What's involved
- Walls prepared, beads fitted, basecoat and mesh applied, then primer and silicone topcoat finished by hand.
- How long it takes
- Often one to two weeks for a house.
- Who it's for
- Domestic and commercial silicone render
Render repairs
Cracked, blown or hollow render cut out and patched, keeping water out and blending in as closely as possible.
- When you need it
- Render is cracked, sounds hollow when tapped, or has come away.
- What's involved
- Loose render cut back, edges squared, background prepared, then new render applied in coats to match.
- How long it takes
- Often one to two days.
- Who it's for
- Domestic and commercial render repairs
Insulated render
Insulation boards fixed to walls and finished with render, improving warmth and giving the building a fresh look.
- When you need it
- Walls are solid or cold and you also want a new finish.
- What's involved
- Boards bonded and anchored, mesh and basecoat applied, then a finishing render coat.
- How long it takes
- Often two to three weeks for a house.
- Who it's for
- Domestic and commercial insulated render
Wall coatings
Masonry paints and textured coatings applied to rendered and masonry walls, refreshing the colour and helping shed water.
- When you need it
- Existing render is sound but faded, stained or dated.
- What's involved
- Walls cleaned and repaired, primer applied, then two coats of masonry coating.
- How long it takes
- Often three to five days for a house.
- Who it's for
- Domestic and commercial wall coatings
Sand and cement render
Traditional sand and cement render applied in two coats, a durable finish for walls that can then be painted.
- When you need it
- Blockwork needs a finish, or old render is being replaced like for like.
- What's involved
- Walls prepared, scratch coat applied and keyed, then a float coat finished smooth or textured.
- How long it takes
- Often one to two weeks for a house.
- Who it's for
- Domestic and commercial sand and cement render
Monocouche render
Through-coloured monocouche render that does not need painting, applied in one thick coat and scraped to finish.
- When you need it
- You want a coloured, low-maintenance finish on block or brick walls.
- What's involved
- Walls prepared and beaded, render sprayed or trowelled on, then scraped back to a textured finish.
- How long it takes
- Often one to two weeks for a house.
- Who it's for
- Domestic and commercial monocouche render
Render removal
Failed or unsuitable render stripped back to the brick or block before repairs or a new finish go on.
- When you need it
- Render is cracked and trapping moisture, or you want the brickwork exposed again.
- What's involved
- Render hacked off carefully, wall cleaned and checked, then repointed or prepared for new render.
- How long it takes
- Often two to five days.
- Who it's for
- Domestic and commercial render removal
Pebble dash repairs
Pebble dash and dry dash finishes patched or reapplied to match existing walls on older homes.
- When you need it
- Pebble dash is cracked, missing in patches, or needs matching after other works.
- What's involved
- Loose areas removed, base coat applied, matching stones thrown on and pressed in.
- How long it takes
- Usually one to three days.
- Who it's for
- Domestic pebble dash repairs
Lime render
Breathable lime render for older solid-walled and stone buildings, letting moisture escape rather than trapping it.
- When you need it
- An older building has cement render causing damp, or needs a traditional finish.
- What's involved
- Old render removed if needed, background wetted, lime render applied in thin coats and cured slowly.
- How long it takes
- Often one to three weeks.
- Who it's for
- Domestic and commercial lime render
Render cleaning
Algae, dirt and staining cleaned from render with soft washing, followed by a biocide to slow regrowth.
- When you need it
- Render has turned green, black or streaky.
- What's involved
- Surface treated with biocide, soft washed at low pressure and rinsed down.
- How long it takes
- Usually one to two days.
- Who it's for
- Domestic and commercial render cleaning