Standby generator connection
Wiring a fixed standby generator into the building supply so it can power essential circuits during an outage.
- When you need it
- You have bought a generator or need backup power for a site that cannot go dark.
- What's involved
- Load assessed, cables run, generator connected through a changeover, then tested and certified.
- How long it takes
- Usually one to two days.
- Who it's for
- Commercial and industrial standby generator connection

