Every type of commercial Fit-Out job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Office fit-outs
Office fit-outs covering partitions, ceilings, lighting, power, data and fire systems, delivered by one coordinated team.
- When you need it
- You are moving into, expanding or refreshing an office space.
- What's involved
- Layout agreed, partitions and ceilings built, electrics, data and fire alarm installed, then finishes completed.
- How long it takes
- Often two to eight weeks, depending on size.
- Who it's for
- Commercial office fit-outs
Shop fit-outs
Retail fit-outs with shopfronts, lighting, power and fire safety in place, so the unit is ready to trade.
- When you need it
- You are opening a new shop or refitting an existing unit.
- What's involved
- Unit stripped back, walls and ceilings formed, lighting and power installed, fire systems fitted and finishes completed.
- How long it takes
- Often two to six weeks.
- Who it's for
- Commercial shop fit-outs
Restaurant fit-outs
Restaurant, cafe and bar fit-outs with kitchen extraction, power, lighting and fire safety coordinated together.
- When you need it
- You are opening or refurbishing a restaurant, cafe or bar.
- What's involved
- Kitchen and bar areas planned, services and extraction installed, fire alarm and emergency lighting fitted, then finishes.
- How long it takes
- Often four to ten weeks.
- Who it's for
- Commercial restaurant fit-outs
Change of use works
Building works to convert offices, shops or houses to a new use, such as flats or shared houses.
- When you need it
- A building has, or is applying for, consent for a new use and needs works to suit.
- What's involved
- Layout reconfigured, fire separation and escape routes built, services adapted, and works signed off by building control.
- How long it takes
- Often several weeks to a few months.
- Who it's for
- Domestic and commercial change of use works
Industrial unit fit-outs
Industrial and warehouse units fitted out with offices, welfare areas, lighting and power for production or storage.
- When you need it
- You are taking on a new industrial or warehouse unit.
- What's involved
- Office and welfare areas built, high-bay lighting and power installed, toilets and kitchens fitted, and fire systems added.
- How long it takes
- Often three to eight weeks.
- Who it's for
- Commercial and industrial industrial unit fit-outs
Landlord base fit-outs
Base fit-outs for landlords, with ceilings, lighting, floor finishes and core services ready for a tenant to move in.
- When you need it
- A landlord needs a vacant space ready to let.
- What's involved
- Ceilings, lighting, floor finishes, toilets and base services installed to a lettable standard.
- How long it takes
- Often four to eight weeks.
- Who it's for
- Commercial landlord base fit-outs
Washroom refurbishments
Staff and customer toilets, washrooms and kitchens refurbished with new sanitaryware, finishes and ventilation.
- When you need it
- Staff or customer facilities are dated, worn or no longer fit for use.
- What's involved
- Room stripped, plumbing and ventilation upgraded, walls and floors finished, and new fittings installed.
- How long it takes
- Often one to two weeks.
- Who it's for
- Commercial and industrial washroom refurbishments
Care home refurbishments
Refurbishment works in care homes and clinics, planned around residents with fire safety kept in place throughout.
- When you need it
- A care home or clinic needs rooms or communal areas upgraded.
- What's involved
- Works phased room by room, fire alarm and nurse call protected or extended, then finishes completed.
- How long it takes
- Often planned in phases over several weeks.
- Who it's for
- Commercial care home refurbishments
Dilapidations works
End-of-lease repairs and reinstatement, so the space is handed back in the condition the lease asks for.
- When you need it
- A lease is ending and a dilapidations schedule has been issued.
- What's involved
- Schedule reviewed, partitions removed or repaired, decoration, ceilings and services reinstated, and the space cleared.
- How long it takes
- Often one to four weeks.
- Who it's for
- Commercial and industrial dilapidations works
Mezzanine floors
Steel mezzanine floors installed in warehouses and units, adding storage or office space without moving premises.
- When you need it
- You need more floor space inside a tall unit.
- What's involved
- Design and loadings agreed, steel frame erected, deck fitted, stairs and handrails added, and fire protection installed where needed.
- How long it takes
- Often one to three weeks.
- Who it's for
- Commercial and industrial mezzanine floors