Every type of demolition job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Soft strip
Internal fixtures, finishes and services stripped out back to the structure, ready for refurbishment or fit-out.
- When you need it
- A building is being refurbished, converted or refitted.
- What's involved
- Services isolated, fittings, ceilings, partitions and floor finishes removed, and waste separated and taken away.
- How long it takes
- Often a few days to a couple of weeks.
- Who it's for
- Domestic, commercial and industrial soft strip
Wall removal
Internal walls removed to open up rooms, with steel beams and props where the wall is load-bearing.
- When you need it
- You want an open-plan layout or to join two rooms together.
- What's involved
- Wall checked by an engineer if load-bearing, props set, wall removed, steel installed and the area made good.
- How long it takes
- Usually two to four days.
- Who it's for
- Domestic and commercial wall removal
Site clearance
Sites cleared of rubble, vegetation and old structures, leaving a clean, level area ready for the next stage.
- When you need it
- A plot or yard needs clearing after demolition or before building.
- What's involved
- Debris and vegetation removed, small structures taken down, waste loaded out and the ground levelled.
- How long it takes
- Depends on size; often one to three days.
- Who it's for
- Domestic, commercial and industrial site clearance
Waste removal
Demolition and strip-out waste removed and taken to licensed sites, with materials separated for recycling where possible.
- When you need it
- Works leave rubble, timber, metals or general waste to clear.
- What's involved
- Waste sorted on site, loaded into skips or grab lorries, and waste transfer notes provided.
- How long it takes
- Often a few hours to a day.
- Who it's for
- Domestic, commercial and industrial waste removal
Garage and outbuilding demolition
Garages, sheds and outbuildings taken down safely, including their concrete bases, with all the waste cleared away.
- When you need it
- An old garage or outbuilding is unsafe or in the way of a new build.
- What's involved
- Services checked, roof and walls dismantled, base broken out if required and waste removed.
- How long it takes
- Usually one to three days.
- Who it's for
- Domestic and commercial garage and outbuilding demolition
Chimney breast removal
Chimney breasts removed to free up floor space, with the stack above properly supported.
- When you need it
- A chimney breast is no longer used and you want the room space back.
- What's involved
- Support for the stack checked, breast taken out, supports or steels fitted, flue capped and walls and floor made good.
- How long it takes
- Usually two to three days.
- Who it's for
- Domestic chimney breast removal
Pre-demolition asbestos checks
Asbestos surveys arranged before strip-out or demolition, so any asbestos is found and dealt with before work starts.
- When you need it
- An older building is due for refurbishment or demolition.
- What's involved
- Survey arranged with a specialist, results reviewed, and any asbestos removal planned before works begin.
- How long it takes
- The survey usually takes a few hours to a day.
- Who it's for
- Domestic, commercial and industrial pre-demolition asbestos checks
Concrete breaking
Concrete slabs, bases, paths and hardstanding broken out and removed, ready for new surfaces or foundations.
- When you need it
- Old concrete needs removing for a new extension, drive or garden.
- What's involved
- Area marked out, concrete broken up with breakers, rubble loaded out and the ground left level.
- How long it takes
- Usually one to two days.
- Who it's for
- Domestic, commercial and industrial concrete breaking
Partial demolition
Parts of buildings taken down in a controlled way while the rest is kept, and often stays in use.
- When you need it
- An extension, rear wing or part of a structure needs removing.
- What's involved
- Method agreed, structure propped where needed, sections dismantled by hand or machine, and the retained building made weathertight.
- How long it takes
- Often several days to a few weeks.
- Who it's for
- Domestic, commercial and industrial partial demolition
Kitchen and bathroom strip-out
Old kitchens and bathrooms removed with services safely capped, leaving the room clear and ready for refitting.
- When you need it
- A kitchen or bathroom is being replaced.
- What's involved
- Water and power isolated, units, sanitaryware and tiles removed, services capped and waste cleared.
- How long it takes
- Usually a day.
- Who it's for
- Domestic and commercial kitchen and bathroom strip-out