Lightning protection testing
Periodic inspection and testing of an existing system, with a written report of condition and faults.
- When you need it
- The last test report is out of date or you have never had one.
- What's involved
- Visual check of air terminals, conductors and joints, earth resistance tested, results recorded in a report.
- How long it takes
- Usually half a day to a day, depending on size.
- Who it's for
- Commercial and industrial lightning protection testing

