Every type of building regulations support job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Building control notifications
Notifications for the work we carry out handled for you, so it is recorded and can be signed off.
- When you need it
- Before or after starting work that building control needs to know about.
- What's involved
- We confirm what is notifiable, submit the notice for our work and keep you updated.
- How long it takes
- Usually handled within a few days.
- Who it's for
- Domestic, commercial and industrial building control notifications
Notifiable electrical work
New circuits, rewires and consumer units installed, tested and certified so the work can be signed off.
- When you need it
- When fitting new circuits, a new fuse board or electrics in kitchens and bathrooms.
- What's involved
- We install the work, test it, issue the electrical certificate and notify it where required.
- How long it takes
- From a day to a week, depending on the job.
- Who it's for
- Domestic, commercial and industrial notifiable electrical work
Fire alarm certificates
Fire alarm installation and commissioning certificates supplied so building control has the evidence it asks for.
- When you need it
- When a new or altered fire alarm system is part of building work.
- What's involved
- We install or check the system, test every device and issue the certificates.
- How long it takes
- Usually a day, longer for large systems.
- Who it's for
- Domestic, commercial and industrial fire alarm certificates
Emergency lighting certificates
Emergency lighting tested and certified as part of new or altered work, ready for building control.
- When you need it
- When emergency lighting is installed or changed as part of building work.
- What's involved
- We fit or check the lighting, carry out a full duration test and issue the certificate.
- How long it takes
- Usually half a day to a day.
- Who it's for
- Commercial and industrial emergency lighting certificates
Stage inspections booked
Building control inspections booked at the right points, so work is not covered up before it is checked.
- When you need it
- During projects where building control needs to see work at set stages.
- What's involved
- We plan the stages, book inspections in good time and have the work ready to view.
- How long it takes
- Ongoing through the project.
- Who it's for
- Domestic, commercial and industrial stage inspections booked
Completion certificate help
Help pulling together the certificates and details building control needs before issuing a completion certificate.
- When you need it
- When a project is finished but sign-off is still outstanding.
- What's involved
- We list what is missing, supply our certificates and liaise with building control on our work.
- How long it takes
- Often a few days to a couple of weeks.
- Who it's for
- Domestic, commercial and industrial completion certificate help
Regularisation support
Testing, opening up and certificates for work done without approval, to support a regularisation application to the council.
- When you need it
- When earlier work was never signed off, often found during a sale.
- What's involved
- We inspect the work, carry out tests and any remedial works, and supply certificates for our part.
- How long it takes
- Varies, often a few weeks.
- Who it's for
- Domestic and commercial regularisation support
Loft conversion fire safety
Fire doors, mains-linked alarms and protected escape routes fitted as building control asks for loft conversions.
- When you need it
- When adding a loft room or converting the roof space.
- What's involved
- We fit and link alarms, upgrade doors on the escape route and certify the alarm system.
- How long it takes
- Usually 1 to 3 days.
- Who it's for
- Domestic loft conversion fire safety
Change of use fire safety
Fire alarms, emergency lighting and fire separation fitted when a building is converted to flats or another use.
- When you need it
- When converting a house to flats, an HMO or a commercial use.
- What's involved
- We design and fit the fire safety works, test them and supply certificates for sign-off.
- How long it takes
- From a few days to several weeks.
- Who it's for
- Domestic, commercial and industrial change of use fire safety
Fire stopping for sign-off
Gaps around pipes and cables in fire walls and floors sealed, with photo records for building control.
- When you need it
- When services pass through fire walls, floors or ceilings in new or altered work.
- What's involved
- We find and seal penetrations with fire-rated products, label and photograph each one.
- How long it takes
- Usually 1 to 3 days.
- Who it's for
- Domestic, commercial and industrial fire stopping for sign-off