Every type of suspended ceilings & partitions job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Suspended ceiling installation
A new grid ceiling with tiles fitted to hide services, improve the look and make maintenance easier.
- When you need it
- When fitting out or refurbishing offices, shops, classrooms or units.
- What's involved
- We set levels, fix the grid, fit tiles and cut in for lights, vents and detectors.
- How long it takes
- Usually 1 to 5 days, depending on area.
- Who it's for
- Commercial and industrial suspended ceiling installation
Ceiling tile replacement
Stained, damaged or sagging ceiling tiles replaced to tidy the space without replacing the whole ceiling.
- When you need it
- After leaks, damage or when tiles look tired and discoloured.
- What's involved
- We match the tile type, remove damaged tiles, fit new ones and check the grid.
- How long it takes
- Usually a few hours to a day.
- Who it's for
- Commercial and industrial ceiling tile replacement
Ceiling access hatches
Access hatches fitted in ceilings so valves, cables and equipment can be reached without damage.
- When you need it
- When services above the ceiling need regular access.
- What's involved
- We mark positions, cut in the openings and fit framed hatches to suit the ceiling.
- How long it takes
- Usually a few hours.
- Who it's for
- Commercial and industrial ceiling access hatches
Office partition walls
Partition walls installed to create offices, meeting rooms and storage, quickly and with little mess.
- When you need it
- When reorganising an office or creating new rooms in open space.
- What's involved
- We set out the walls, fix the frames, board and finish them and fit doors.
- How long it takes
- Usually 1 to 5 days.
- Who it's for
- Commercial and industrial office partition walls
Stud wall installation
Timber or metal stud walls built to split rooms or create new spaces, finished ready for decoration.
- When you need it
- When dividing a room or building new internal walls.
- What's involved
- We fix the frame, add insulation if needed, board and skim, and fit any doors.
- How long it takes
- Usually 1 to 3 days per wall.
- Who it's for
- Domestic, commercial and industrial stud wall installation
Fire-rated partitions
Partitions built to give fire separation between rooms, corridors or escape routes.
- When you need it
- When a layout change needs fire separation or a protected escape route.
- What's involved
- We build the frame with fire-rated boards, seal joints and penetrations and fit fire doors.
- How long it takes
- Usually 2 to 5 days.
- Who it's for
- Commercial and industrial fire-rated partitions
Acoustic ceilings and walls
Sound-absorbing ceilings and insulated walls that cut noise between rooms and reduce echo.
- When you need it
- For meeting rooms, classrooms, clinics and open-plan offices.
- What's involved
- We fit acoustic tiles, insulation and sealed partitions to reduce sound passing through.
- How long it takes
- Usually 1 to 5 days.
- Who it's for
- Commercial and industrial acoustic ceilings and walls
LED ceiling panel lighting
Flat LED panels fitted into suspended ceilings for bright, even, energy-efficient lighting.
- When you need it
- When upgrading old fluorescent fittings or fitting out a new ceiling.
- What's involved
- We remove old fittings, wire in LED panels, test the circuits and certify the work.
- How long it takes
- Usually 1 to 2 days.
- Who it's for
- Commercial and industrial LED ceiling panel lighting
Glazed office partitions
Glass partitions that create separate rooms while keeping the space light and open.
- When you need it
- When you need meeting rooms or offices without losing natural light.
- What's involved
- We survey, fix the frames, install the glazing panels and fit the doors.
- How long it takes
- Usually 2 to 5 days.
- Who it's for
- Commercial and industrial glazed office partitions
Office strip-out and refit
Old ceilings, partitions and fittings stripped out and replaced to suit a new layout.
- When you need it
- When taking on new premises or reorganising an existing office.
- What's involved
- We strip out old ceilings and walls, then install new partitions, ceiling and lighting.
- How long it takes
- Often 1 to 3 weeks.
- Who it's for
- Commercial and industrial office strip-out and refit