Every type of secure information boxes job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Secure information box installation
Supply and fitting of a lockable box for firefighters at the main entrance of a high-rise residential block.
- When you need it
- Your block meets the height threshold and has no box fitted.
- What's involved
- Location agreed with you, box fixed securely, lock set for fire service access and contents placed inside.
- How long it takes
- Usually half a day.
- Who it's for
- Commercial secure information box installation
Floor plan drawings
Clear, simple floor plans for each level showing stairs, lifts, risers and key fire safety features.
- When you need it
- You have no plans, or the existing ones are out of date or too detailed to read quickly.
- What's involved
- Each floor surveyed and measured, plans drawn, checked with you and printed for the box.
- How long it takes
- Usually a few days depending on building size.
- Who it's for
- Commercial floor plan drawings
Single-page building plan
A one-page overview of the whole building showing access points, firefighting equipment and essential services.
- When you need it
- The fire service would struggle to get a quick overview from the plans you hold.
- What's involved
- Site walked, key features noted, plan drawn on a single sheet and laminated for the box.
- How long it takes
- Usually a day or two.
- Who it's for
- Commercial single-page building plan
Responsible person details pack
A clear sheet listing the responsible person, out-of-hours contacts and how to get into plant rooms and risers.
- When you need it
- Contact details in the box are missing, wrong or still name a previous agent.
- What's involved
- Details gathered from you, sheet drafted and checked, then placed in the box with a dated copy kept on file.
- How long it takes
- Usually done within a single visit.
- Who it's for
- Commercial responsible person details pack
Floor identification signs
Floor number signs on every landing and lobby so firefighters can tell which level they are on, even in smoke.
- When you need it
- Stair landings and lift lobbies have no clear floor numbers, or signs are faded or missing.
- What's involved
- Each landing surveyed, sign positions agreed, signs fixed at the right height and visibility checked.
- How long it takes
- Usually a day for a typical block.
- Who it's for
- Commercial floor identification signs
Flat indicator signs
Signs on each floor showing which flat numbers are reached from that landing or corridor.
- When you need it
- Corridors are confusing and flat numbers cannot be found quickly from the stairs.
- What's involved
- Flat layout confirmed floor by floor, signs made to match and fixed in stair and lift lobbies.
- How long it takes
- Usually a day for a typical block.
- Who it's for
- Commercial flat indicator signs
Box contents check and update
A visit to check the box opens, the contents are current and the plans still match the building.
- When you need it
- It has been a while since anyone looked inside the box, or works have changed the layout.
- What's involved
- Box opened and inspected, plans and contacts checked against the building, updated documents swapped in.
- How long it takes
- Usually an hour or two.
- Who it's for
- Commercial box contents check and update
Damaged box replacement
Removal of a vandalised, rusted or seized box and fitting of a new one with contents transferred.
- When you need it
- The box has been forced, the lock is seized or it no longer closes properly.
- What's involved
- Old box removed, wall made good, new box fitted, lock set and contents moved across and checked.
- How long it takes
- Usually half a day.
- Who it's for
- Commercial damaged box replacement
Electronic building plans
Digital copies of floor plans and the building plan prepared for the responsible person to share with the fire service.
- When you need it
- You have paper plans only and need electronic copies for the fire service.
- What's involved
- Plans digitised or redrawn, files checked for clarity and passed to you ready to send.
- How long it takes
- Usually a few days.
- Who it's for
- Commercial electronic building plans
Premises information survey
A walk-round survey to gather everything needed for the box, plans and signs before any work is ordered.
- When you need it
- You are not sure what the building already has or what is missing.
- What's involved
- Building walked top to bottom, existing box, signs and plans recorded, then a short written list of gaps.
- How long it takes
- Usually half a day.
- Who it's for
- Commercial premises information survey