Every type of dry lining job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.
Metal stud partitions
Metal stud partitions put up quickly to divide rooms and offices, with acoustic or fire-rated options built in.
- When you need it
- You need to divide a space into offices, flats or rooms.
- What's involved
- Track set out and fixed, studs fitted, insulation added, boards fixed and joints taped ready for decoration.
- How long it takes
- Often a day or two per room.
- Who it's for
- Domestic, commercial and industrial metal stud partitions
Fire-rated walls
Fire-rated boarded walls and linings built to the required fire resistance, with sealed junctions and penetrations.
- When you need it
- A wall needs to form part of a fire-resisting compartment, protected stair or escape route.
- What's involved
- Specified stud and board system installed, joints filled, penetrations fire-stopped and the work recorded with photos.
- How long it takes
- Depends on area; often a few days.
- Who it's for
- Domestic, commercial and industrial fire-rated walls
Suspended ceilings
Grid and tile or plasterboard suspended ceilings fitted, hiding services while keeping access for maintenance.
- When you need it
- A commercial space needs a new ceiling, or old tiles are stained and damaged.
- What's involved
- Levels set, hangers and grid fixed, lights and vents coordinated, then tiles or boards fitted.
- How long it takes
- Often a few days per floor.
- Who it's for
- Commercial and industrial suspended ceilings
Insulated lining
Insulated plasterboard fixed to cold external walls, cutting heat loss and reducing condensation on the inside face.
- When you need it
- Solid walls feel cold, or rooms suffer from condensation and mould.
- What's involved
- Walls prepared, insulated boards fixed on dabs or battens, vapour control detailed, and joints taped and finished.
- How long it takes
- Often a day or two per room.
- Who it's for
- Domestic and commercial insulated lining
Plasterboard ceilings
New plasterboard ceilings fitted on timber or metal frames, replacing cracked, sagging or fallen old ceilings.
- When you need it
- A ceiling is cracked, sagging or has come down, or a space is being converted.
- What's involved
- Old ceiling removed if needed, framing checked, boards fixed, joints taped and finished ready for paint.
- How long it takes
- Usually a day per room.
- Who it's for
- Domestic, commercial and industrial plasterboard ceilings
Acoustic partitions
Partitions built with acoustic insulation and dense boards to reduce sound passing between offices, flats and rooms.
- When you need it
- Noise carries between rooms, meeting areas or flats.
- What's involved
- Stud wall built with acoustic insulation, double boarding and sealed edges to cut sound paths.
- How long it takes
- Often one to two days per wall.
- Who it's for
- Domestic, commercial and industrial acoustic partitions
Boxing in and bulkheads
Pipes, cables and ductwork boxed in neatly with plasterboard, including fire-rated boxing where it is needed.
- When you need it
- Services run across walls or ceilings and need hiding or protecting.
- What's involved
- Frame built around the services, boards fixed with access panels where needed, then joints finished.
- How long it takes
- Often half a day to a day.
- Who it's for
- Domestic, commercial and industrial boxing in and bulkheads
Taping and jointing
Plasterboard joints taped, filled and sanded to a smooth finish ready for decoration, without needing a skim coat.
- When you need it
- New boarding is up and needs finishing for paint.
- What's involved
- Joints taped and filled in coats, sanded smooth, and corners and edges beaded.
- How long it takes
- Often one to two days per room, allowing drying time.
- Who it's for
- Domestic, commercial and industrial taping and jointing
Steel beam encasement
Steel beams and columns boxed in with fire-rated board, giving them the fire protection the building needs.
- When you need it
- Exposed steels need fire protection after an extension, conversion or alteration.
- What's involved
- Steel measured, a fire board system fixed around it with the correct layers and fixings, then joints finished.
- How long it takes
- Usually a day for a few steels.
- Who it's for
- Domestic, commercial and industrial steel beam encasement
Dot and dab dry lining
Plasterboard bonded to masonry walls with adhesive dabs, a quick and dry alternative to traditional wet plastering.
- When you need it
- Brick or block walls need a smooth finish quickly, without waiting for plaster to dry.
- What's involved
- Walls checked, adhesive dabs applied, boards pressed to line and level, then joints taped and finished.
- How long it takes
- Usually a day per room.
- Who it's for
- Domestic, commercial and industrial dot and dab dry lining