Fire, electrical & security compliance07517 806082
Get a quote

Compliance & Property

HMO Licensing Pack

A complete HMO licence pack: we check the property against the council's standards, produce the floor plan, certificates and fire risk assessment, and prepare the application so it goes in complete first time.

HMO Licensing Pack: modern apartment building exterior

HMO licensing pack

From £750 per property

Everything the council needs for a new HMO licence or a renewal, checked and prepared by one team. The council's own licence fee, and any works needed to meet its standards, are separate.

  • Pre-licence inspection against the council's HMO standards
  • Measured floor plan with room sizes, fire doors and alarms marked
  • Fire risk assessment
  • Fire alarm and emergency lighting certificates
  • Electrical installation condition report (EICR)
  • Gas safety certificate where there is gas
  • Completed application and supporting documents
  • Schedule of any works needed, priced separately

Book an HMO licence pack Call 07517 806082

Qualified engineersTrained and equipped for the job
Certificates every timePaperwork you can share with insurers and agents
Clear written quotesKnow the price before we start
Fast responseUrgent faults prioritised

HMO Licensing Pack made simple

Staying compliant does not need to be complicated. We take care of the checks, the paperwork and the reminders so you can get on with running your property.

Because we carry out the fire alarm, emergency lighting, electrical testing and fire door work ourselves, any gaps found in the pre-licence check can be put right by the same team before the application goes in.

We work across Lancashire, Greater Manchester and Merseyside, for HMO landlords, letting agents and investors.

What's included

  • Pre-licence inspection against the council's HMO standards
  • Measured floor plan with room sizes, fire doors and alarms marked
  • Fire risk assessment, fire alarm and emergency lighting certificates, EICR and gas safety
  • Application prepared, with a schedule of any works needed
Modern apartment building exterior

How it works

  1. 1
    Review

    We check what you have and what is missing.

  2. 2
    Plan

    A simple plan and clear price.

  3. 3
    Deliver

    Visits booked and completed.

  4. 4
    Keep on track

    Certificates stored and renewals reminded.

Why choose us

  • One contact for every certificate
  • Visits combined to save time
  • Paperwork shared digitally
  • Reminders before renewals

When to call us

  • A new HMO with five or more tenants
  • A licence coming up for renewal
  • The council has asked for documents or works
  • Buying a property to let as an HMO
  • An additional licensing scheme introduced in your area

Questions we get asked

Which HMOs need a licence?

In England, any HMO occupied by five or more people forming two or more households needs a mandatory licence. Some councils also license smaller HMOs under additional licensing schemes, so we check the rules for your area.

What is included in the pack?

A pre-licence inspection, a measured floor plan, a fire risk assessment, fire alarm and emergency lighting certificates, an EICR, a gas safety certificate where there is gas, and the completed application with supporting documents.

Is the council's fee included?

No. The council's licence fee is paid to the council and varies between areas. The pack price covers our inspection, documents and application preparation; any remedial works are quoted separately.

Can you deal with my tenants or agent?

Yes, we arrange access directly.

Do you send reminders?

Yes, before each certificate is due.

Types of HMO licensing pack jobs we do

Every type of HMO licensing pack job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.

New HMO licence application

A complete pack for a first HMO licence, with every document checked so the council has what it asks for.

When you need it
When a property becomes licensable or you are opening a new HMO.
What's involved
We inspect the property, gather the certificates, draw the floor plan and prepare the forms ready for you to submit.
How long it takes
Usually 1 to 3 weeks, depending on certificates and any works.
Who it's for
Domestic and commercial new HMO licence application

HMO licence renewal

Renewal paperwork prepared before the current licence runs out, with certificates brought up to date to avoid gaps.

When you need it
A few months before your existing HMO licence is due to expire.
What's involved
We recheck the property, renew any out-of-date certificates, update the floor plan and prepare the renewal forms.
How long it takes
Often 1 to 2 weeks.
Who it's for
Domestic and commercial HMO licence renewal

Pre-licence inspection

A walk-round check against the council's HMO standards that shows what needs fixing before you apply.

When you need it
Before applying, buying a property to run as an HMO or changing its layout.
What's involved
We check room sizes, fire doors, alarms, amenities and general condition, then give you a written list of works.
How long it takes
Typically 2 to 3 hours on site.
Who it's for
Domestic and commercial pre-licence inspection

HMO floor plans

Measured floor plans showing room sizes, fire doors, alarms and escape routes, drawn the way councils usually ask.

When you need it
When the council's application asks for a plan or the layout has changed.
What's involved
We measure every room and floor, note fire safety features and produce a clear labelled drawing.
How long it takes
Usually a 1 to 3 hour visit, plans within a few days.
Who it's for
Domestic and commercial HMO floor plans

HMO fire risk assessment

A fire risk assessment of the shared parts and escape routes, with clear actions to keep tenants safe.

When you need it
For a new licence, a renewal, or after changes to the building or occupancy.
What's involved
We inspect escape routes, doors, alarms, lighting and fire hazards, then write up findings and priority actions.
How long it takes
Typically 2 to 4 hours on site, report within a week.
Who it's for
Domestic and commercial HMO fire risk assessment

Additional licensing applications

Application packs for smaller HMOs caught by a council's additional licensing scheme, prepared and checked before submission.

When you need it
When your council brings in or extends an additional licensing scheme covering your property.
What's involved
We confirm what the scheme asks for, inspect the property, collect certificates and prepare the documents.
How long it takes
Usually 1 to 3 weeks.
Who it's for
Domestic and commercial additional licensing applications

HMO amenity standards check

A check of kitchens, bathrooms, toilets and room sizes against the council's amenity standards for the number of tenants.

When you need it
When planning occupancy numbers or before a licence application or inspection.
What's involved
We count and measure facilities and rooms, compare them with the local standards and note any shortfalls.
How long it takes
Usually 1 to 2 hours.
Who it's for
Domestic and commercial HMO amenity standards check

Licence condition works

Works carried out to meet conditions or a schedule attached to your licence, with evidence ready for the council.

When you need it
When the council has issued conditions or a list of works with a deadline.
What's involved
We review the conditions, price the works, carry them out and supply photos and certificates as proof.
How long it takes
From a day to a few weeks, depending on the works.
Who it's for
Domestic and commercial licence condition works

Change of licence holder

A fresh application pack prepared when the property is sold or the manager changes, as licences usually cannot be transferred.

When you need it
When an HMO is bought, sold or handed to a new licence holder or manager.
What's involved
We check current certificates and plans, update anything out of date and prepare the new application documents.
How long it takes
Usually 1 to 2 weeks.
Who it's for
Domestic and commercial change of licence holder

HMO certificate bundle

All the safety certificates an HMO application needs, organised in one bundle and kept in date.

When you need it
When certificates are missing, expiring or scattered across different contractors.
What's involved
We arrange the electrical report, gas safety check, fire alarm and emergency lighting tests and collate the paperwork.
How long it takes
Often 1 to 2 days on site.
Who it's for
Domestic and commercial HMO certificate bundle

HMO Licensing Pack: install, maintain and repair

HMO Licensing Pack installation

Survey, design and a neat, tested installation with full paperwork.

HMO Licensing Pack maintenance

Planned servicing that keeps it reliable and compliant, with reports after every visit.

HMO Licensing Pack repair

Fault finding and repairs on any make, with urgent faults prioritised.

Domestic, commercial and industrial

Domestic HMO licensing pack

For homes and rental properties: tidy work, clear explanations and certificates for landlords and agents.

Commercial HMO licensing pack

For offices, shops, hospitality and managed buildings, planned around your opening hours.

Industrial HMO licensing pack

For factories, warehouses and industrial units, working safely around your operations.

Same day service

Urgent HMO licensing pack fault? Call 07517 806082. Same-day attendance is often possible, and urgent faults are always prioritised.

HMO Licensing Pack near me

Searching for HMO licensing pack near me? We cover Lancashire, Greater Manchester and Merseyside.

Need a certificate, a repair or a quote?

Tell us the address and what you need. We reply the same working day.