Fire, electrical & security compliance07517 806082
Get a quote

Networks & IT

Fibre Optic Installation

We install, splice, terminate and test fibre optic cabling between floors, buildings and outbuildings for fast, reliable network links. The work suits offices, schools, warehouses, industrial sites, places of worship and large homes across Lancashire, Greater Manchester and Merseyside.

Fibre Optic Installation: network cabinet with patch panels and cabling in a comms room
Qualified engineersTrained and equipped for the job
Certificates every timePaperwork you can share with insurers and agents
Clear written quotesKnow the price before we start
Fast responseUrgent faults prioritised

Fibre Optic Installation made simple

Fast, reliable connections are essential for any building. We plan, install and support networks that just work.

Our team plans the route, installs and terminates the fibre and tests each link before handover. Because we also do groundworks, data cabling and CCTV, we can dig the duct run and connect the equipment at each end in the same job.

We work across Lancashire, Greater Manchester and Merseyside, for businesses, schools and site owners.

What's included

  • Route survey and planning
  • Cable installation and ducting
  • Splicing and termination
  • Testing and results report
Modern apartment building exterior

How it works

  1. 1
    Survey

    We check the building and your needs.

  2. 2
    Plan

    A simple design and price.

  3. 3
    Install

    Cabling and equipment fitted and tested.

  4. 4
    Handover

    Everything documented and explained.

Why choose us

  • Neat, labelled installs
  • Every cable tested
  • Coverage where you need it
  • Support after installation

When to call us

  • The network link to another building keeps dropping
  • You are adding an outbuilding, office or warehouse to the network
  • Copper cable runs are too long for reliable speeds
  • CCTV or phones in a remote building are unreliable
  • A fibre cable has been damaged during building work

Questions we get asked

Why use fibre instead of network cable between buildings?

Fibre can run much further than copper network cable and is not affected by electrical interference or lightning between buildings. It is the usual choice for links between separate buildings.

Can you run fibre underground?

Yes. We can dig trenches and lay ducts ourselves, or use existing ducts where they are clear.

Do you test the fibre after installation?

Yes. Every link is tested and we give you the results so you have a record of how the cable performed on handover.

Can you work outside office hours?

Yes, to avoid disrupting your team.

Do you supply the equipment?

Yes, or we can install equipment you already have.

Types of fibre optic installation jobs we do

Every type of fibre optic installation job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.

Building to building fibre link

Fibre cable installed between separate buildings on one site to share the network, CCTV and phones.

When you need it
You need to connect an outbuilding, second office or warehouse to the main network.
What's involved
Route surveyed, duct or overhead route prepared, fibre installed, terminated at both ends and tested.
How long it takes
Usually one to three days.
Who it's for
Domestic, commercial and industrial building to building fibre link

Fibre backbone between floors

Fibre links run up risers between floors to connect network cabinets across a multi-storey building.

When you need it
You are fitting out a multi-floor building or upgrading old copper links.
What's involved
Riser routes checked, fibre installed and secured, terminated into cabinets and every core tested.
How long it takes
Usually one to three days.
Who it's for
Commercial and industrial fibre backbone between floors

Fibre splicing and termination

Fusion splicing and termination of fibre cores into patch panels or enclosures.

When you need it
New fibre has been laid or existing cable needs connecting to new equipment.
What's involved
Cable prepared, cores fusion spliced to pigtails, panels dressed and each connection tested.
How long it takes
Usually half a day to a day.
Who it's for
Commercial and industrial fibre splicing and termination

External duct installation

Underground ducts laid between buildings to carry fibre and other cables safely.

When you need it
There is no clear route between buildings for a new fibre link.
What's involved
Route marked, services checked, trench dug, duct and draw ropes laid, then backfilled and reinstated.
How long it takes
Usually one to five days.
Who it's for
Domestic, commercial and industrial external duct installation

Fibre testing and certification

Light loss and fault tests on new or existing fibre links, with a results report.

When you need it
You need proof a fibre link performs, or a link is causing network problems.
What's involved
Each core tested end to end, losses and faults measured, results compiled into a report.
How long it takes
Usually a few hours.
Who it's for
Commercial and industrial fibre testing and certification

Fibre fault finding and repair

Locating and repairing broken or damaged fibre cables and joints that have taken a link down.

When you need it
A fibre link has gone down, often after building work or digging.
What's involved
Fault located with test equipment, damaged section exposed, cores re-spliced and link retested.
How long it takes
Usually half a day to a day.
Who it's for
Commercial and industrial fibre fault finding and repair

Fibre to CCTV and gate equipment

Fibre links run to remote cameras, barriers and gate controllers that are too far for copper cable.

When you need it
Cameras or barriers sit far from the main building and keep losing connection.
What's involved
Fibre run to the remote cabinet, media converters fitted, equipment connected and tested.
How long it takes
Usually one to two days.
Who it's for
Commercial and industrial fibre to CCTV and gate equipment

Network cabinet fibre upgrade

Fibre patch panels and enclosures fitted and tidied in existing network cabinets.

When you need it
Cabinets are untidy, full or need space for new fibre links.
What's involved
Cabinet surveyed, panels and trays fitted, fibre rerouted and labelled, links tested.
How long it takes
Usually half a day to a day.
Who it's for
Commercial and industrial network cabinet fibre upgrade

Copper to fibre link replacement

Long or unreliable copper network runs replaced with fibre to improve speed and reliability.

When you need it
A long copper run is slow, drops out or suffers from interference.
What's involved
Existing route assessed, fibre installed alongside, equipment connected, old cable removed once stable.
How long it takes
Usually one to three days.
Who it's for
Commercial and industrial copper to fibre link replacement

Home office and outbuilding fibre

Fibre run from a house to a garden office, garage or annex for a stable internet connection.

When you need it
Wi-Fi does not reach your garden office or outbuilding reliably.
What's involved
Route agreed, cable ducted underground or clipped, ends terminated, equipment connected and tested.
How long it takes
Usually one to two days.
Who it's for
Domestic home office and outbuilding fibre

Fibre Optic Installation: install, maintain and repair

Fibre Optic Installation installation

Survey, design and a neat, tested installation with full paperwork.

Fibre Optic Installation maintenance

Planned servicing that keeps it reliable and compliant, with reports after every visit.

Fibre Optic Installation repair

Fault finding and repairs on any make, with urgent faults prioritised.

Domestic, commercial and industrial

Domestic fibre optic installation

For homes and rental properties: tidy work, clear explanations and certificates for landlords and agents.

Commercial fibre optic installation

For offices, shops, hospitality and managed buildings, planned around your opening hours.

Industrial fibre optic installation

For factories, warehouses and industrial units, working safely around your operations.

Same day service

Urgent fibre optic installation fault? Call 07517 806082. Same-day attendance is often possible, and urgent faults are always prioritised.

Fibre Optic Installation near me

Searching for fibre optic installation near me? We cover Lancashire, Greater Manchester and Merseyside.

Need a certificate, a repair or a quote?

Tell us the address and what you need. We reply the same working day.