Fire, electrical & security compliance07517 806082
Get a quote

Industrial

Industrial electrical testing & EICR

Electrical Testing & EICR for factories, warehouses and industrial units.

Three-phase distribution board with dedicated fire alarm and emergency lighting circuits
Qualified engineersTrained and equipped for the job
Certificates every timePaperwork you can share with insurers and agents
Clear written quotesKnow the price before we start
Fast responseUrgent faults prioritised

Industrial electrical testing & EICR

Industrial sites bring bigger spaces, heavier use and stricter site rules. We plan electrical testing & EICR work around production, shifts and safe access.

Our engineers are used to working at height, in plant areas and on live sites, following your permits and inductions.

We install robust equipment suited to demanding environments and keep it maintained so it stays reliable.

Electrical installation condition reports, remedial work and certification for rental properties, homes and commercial premises.

What's included

  • Full EICR with coded observations
  • C1/C2 remedial work
  • Consumer unit upgrades
  • Electrical installation certificates

How it works

  1. 1
    Site survey

    Hazards, access and requirements.

  2. 2
    Plan

    Work scheduled around operations.

  3. 3
    Deliver

    Safe, permit-led working.

  4. 4
    Maintain

    Planned servicing to prevent downtime.

Modern apartment building exterior

Questions we get asked

Do you work on live sites?

Yes, following your permits, inductions and safety rules.

Can you work at height?

Yes, with the right access equipment for the job.

How often does a rental need an EICR?

At least every five years, and before a new tenancy if no valid report exists.

What happens if it fails?

We quote for the remedial work and issue confirmation once it is done.

From our recent electrical testing & eicr jobs

Photos from our own jobs. Codes, people and other firms' details are blurred.

Three-phase distribution board with dedicated fire alarm and emergency lighting circuits
Three-phase distribution board with dedicated, labelled fire alarm and emergency lighting circuits.
Armoured cables glanded into steel back boxes during an electrical first fix
Armoured cables glanded into steel back boxes at first fix.
Metal-clad consumer unit installed ready for connection
Metal-clad consumer unit installed and ready for connection.

Types of electrical testing & EICR jobs we do

Every type of electrical job: testing and certificates, rewires, consumer units, security lighting, three-phase supplies, machinery wiring and emergency call-outs, for domestic, commercial and industrial customers.

Testing & certification

EICR (Electrical Installation Condition Report)

A full inspection and test of the fixed wiring, showing whether it is safe and what needs fixing.

When you need it
You have no report from the last five years; You are buying, selling or letting a property; Lights flicker or breakers trip.
What's involved
Book → Inspect and test → Report → Put it right.
How long it takes
Most flats and houses take two to four hours. Larger and commercial buildings are planned in advance.
Who it's for
Domestic, commercial and industrial EICR
Full details →

Landlord EICR

The electrical safety report landlords must have for every rented home, with repairs sorted quickly.

When you need it
A new tenancy is starting; Your current report is due to expire; A previous report was unsatisfactory.
What's involved
Arrange access → Inspect and test → Report and quote → Confirm.
How long it takes
Usually two to four hours per property, with the report sent within a couple of days.
Who it's for
Domestic landlord EICR
Full details →

Commercial fixed wire testing

Periodic inspection and testing of the fixed wiring in shops, offices, warehouses and factories.

When you need it
Your insurer has asked for a current report; You have taken on new premises; The building has been altered or extended.
What's involved
Plan → Test → Report → Repair.
How long it takes
From a day for a small shop to several days for large sites, planned to avoid disruption.
Who it's for
Commercial and industrial commercial fixed wire testing
Full details →

PAT testing

Safety testing of plug-in appliances, with labels and an asset register.

When you need it
You have no test records; New equipment has been bought; You let a furnished property.
What's involved
Visual check → Test → Label → Register.
How long it takes
Most small offices are done in a few hours.
Who it's for
Domestic, commercial and industrial PAT testing
Full details →

Electrical installation certificates

Certificates for new circuits, alterations and additions, so your work is properly signed off.

When you need it
You have had new electrical work done; You are selling and need paperwork; Building control has asked for certificates.
What's involved
Inspect → Test → Certify → Notify.
How long it takes
Issued on completion of the work.
Who it's for
Domestic, commercial and industrial electrical installation certificates
Full details →

Thermal imaging inspections

Infrared surveys of distribution boards that find hot spots before they become fires.

When you need it
Your insurer requires thermographic surveys; Boards run warm or smell hot; Loads have increased.
What's involved
Survey → Analyse → Report → Fix.
How long it takes
Usually a few hours per site, with no power shutdown.
Who it's for
Commercial and industrial thermal imaging inspections
Full details →

Domestic electrics

Consumer unit replacement

Replace an old fuse box with a modern consumer unit with full RCD protection.

When you need it
You have an old fuse box or wire fuses; Your EICR recommended an upgrade; Breakers trip for no clear reason.
What's involved
Pre-test → Swap → Test → Certify.
How long it takes
Usually half a day to a full day, with power off during the swap.
Who it's for
Domestic and commercial consumer unit replacement
Full details →

Full house rewire

A complete rewire for older homes, with new circuits, sockets, lighting and a new consumer unit.

When you need it
Old rubber or fabric-covered cables; Very few sockets and lots of extension leads; Old round-pin sockets or brown switches.
What's involved
Plan → First fix → Second fix → Test and certify.
How long it takes
A typical three-bed house takes five to ten working days.
Who it's for
Domestic full house rewire
Full details →

Partial rewires and new circuits

Rewire part of a property or add new circuits without a full rewire.

When you need it
One floor or area has old wiring; You need more power in the kitchen; An extension or outbuilding needs supply.
What's involved
Assess → Plan → Install → Certify.
How long it takes
From half a day for a single circuit to a few days for a floor.
Who it's for
Domestic and commercial partial rewires and new circuits
Full details →

Extra sockets and USB points

New double sockets, USB sockets, outdoor sockets and floor boxes where you need them.

When you need it
Extension leads everywhere; Desk or TV area short of sockets; Need power in a garage or shed.
What's involved
Check → Install → Test → Certify.
How long it takes
Most single sockets take an hour or two.
Who it's for
Domestic and commercial extra sockets and USB points
Full details →

Lighting installation and LED upgrades

New lights, LED downlights, pendants, under-cabinet and dimmable lighting.

When you need it
Dark rooms or old fittings; High lighting bills; Kitchen or bathroom refit.
What's involved
Design → Install → Test → Certify.
How long it takes
From an hour for a single fitting to a day or two for a whole house.
Who it's for
Domestic, commercial and industrial lighting installation and LED upgrades
Full details →

Security and outdoor lighting

PIR floodlights, dusk-to-dawn lights, wall lights and car park lighting that keep property safe.

When you need it
Dark drive, path or yard; Break-ins or vandalism; Car park or loading bay needs lighting.
What's involved
Survey → Plan → Install → Set up.
How long it takes
Most homes take half a day; car parks and yards are planned per site.
Who it's for
Domestic, commercial and industrial security and outdoor lighting
Full details →

Garden and outdoor electrics

Power and lighting for gardens, garages, sheds, garden rooms and outbuildings.

When you need it
New garden room or office; Garage or shed needs power; Hot tub or pond pump.
What's involved
Plan → Install → Connect → Certify.
How long it takes
Usually one to two days depending on distance and digging.
Who it's for
Domestic and commercial garden and outdoor electrics
Full details →

Electric shower circuits

Dedicated circuits for new or upgraded electric showers.

When you need it
Fitting a new electric shower; Upgrading to a higher-power shower; Shower trips or isolator gets hot.
What's involved
Check → Install → Connect → Certify.
How long it takes
Usually half a day.
Who it's for
Domestic electric shower circuits
Full details →

Cooker and hob circuits

Dedicated circuits and connections for ovens, hobs and range cookers.

When you need it
New induction hob; Range cooker installation; Kitchen refit.
What's involved
Check → Install → Connect → Certify.
How long it takes
Usually a few hours.
Who it's for
Domestic and commercial cooker and hob circuits
Full details →

Kitchen and bathroom electrics

All the electrics for a kitchen or bathroom refit, from first fix to final certificate.

When you need it
Kitchen or bathroom refit; Not enough sockets on worktops; Moving appliances.
What's involved
Plan → First fix → Second fix → Certify.
How long it takes
Usually one to two days across first and second fix.
Who it's for
Domestic kitchen and bathroom electrics
Full details →

Extractor fans

Bathroom, kitchen and utility extractor fans to control condensation and mould.

When you need it
Mould or condensation; Noisy or broken fan; Bathroom with no window.
What's involved
Assess → Install → Test → Certify.
How long it takes
Usually two to four hours.
Who it's for
Domestic and commercial extractor fans
Full details →

Extension and loft conversion electrics

First and second fix electrics for extensions, loft conversions and garage conversions.

When you need it
Building an extension; Loft or garage conversion; Building control needs certificates.
What's involved
Plan → First fix → Second fix → Certify.
How long it takes
Spread across the build: usually two to four days on site.
Who it's for
Domestic extension and loft conversion electrics
Full details →

Mains smoke and heat alarm wiring

Mains-powered, interlinked smoke, heat and carbon monoxide alarms.

When you need it
HMO or licensing requirement; Loft conversion or extension; Old alarms over ten years old.
What's involved
Plan → Install → Test → Certify.
How long it takes
Usually half a day for a house.
Who it's for
Domestic and commercial mains smoke and heat alarm wiring
Full details →

Electric heating and storage heaters

Panel heaters, storage heaters, underfloor heating and heating controls.

When you need it
No gas supply; Old storage heaters; Cold rooms or conservatories.
What's involved
Survey → Plan → Install → Certify.
How long it takes
Usually one to two days for a flat.
Who it's for
Domestic and commercial electric heating and storage heaters
Full details →

Smart home and smart switches

Smart lighting, switches, sockets, thermostats and video doorbells.

When you need it
Want app or voice control; Heating schedules; Video doorbell.
What's involved
Choose → Install → Set up → Handover.
How long it takes
Usually a few hours.
Who it's for
Domestic and commercial smart home and smart switches
Full details →

Data, TV and network points

Wired network, TV and phone points where you need them.

When you need it
Poor Wi-Fi in some rooms; Home office set-up; TV on a new wall.
What's involved
Plan → Install → Test → Label.
How long it takes
Usually a few hours to a day.
Who it's for
Domestic and commercial data, TV and network points
Full details →

EV charger circuits

Dedicated supplies for home and workplace EV chargers.

When you need it
New electric car; Charging from a 3-pin plug; Staff want workplace charging.
What's involved
Survey → Install → Set up → Certify.
How long it takes
Usually half a day.
Who it's for
Domestic and commercial EV charger circuits
Full details →

Solar PV and battery connections

Electrical connections, isolation and board work for solar panels and home batteries.

When you need it
Adding a home battery; Solar system faults; Board needs upgrading for solar.
What's involved
Check → Install → Test → Certify.
How long it takes
Usually a day for the electrical works.
Who it's for
Domestic and commercial solar PV and battery connections
Full details →

Surge protection

Surge protection devices that protect electronics from spikes on the supply.

When you need it
Expensive electronics or home office; Recent damage after a storm; Consumer unit upgrade planned.
What's involved
Assess → Install → Test → Certify.
How long it takes
Usually an hour or two.
Who it's for
Domestic, commercial and industrial surge protection
Full details →

Earthing and bonding upgrades

Main earthing and protective bonding to gas and water pipes.

When you need it
EICR flagged missing bonding; New gas or water pipework; Old or undersized earth cable.
What's involved
Test → Upgrade → Label → Certify.
How long it takes
Usually a few hours.
Who it's for
Domestic and commercial earthing and bonding upgrades
Full details →

Commercial & industrial

Three-phase supplies and distribution boards

Three-phase power, distribution boards and sub-mains for workshops, factories and commercial buildings.

When you need it
New machinery needs three-phase; Boards are full or overloaded; Phases are unbalanced.
What's involved
Survey → Design → Install → Test and certify.
How long it takes
From a day for a board change to several days for new sub-mains.
Who it's for
Commercial and industrial three-phase supplies and distribution boards
Full details →

Machinery wiring and isolation

Supplies, isolators, emergency stops and control wiring for machines.

When you need it
New or relocated machinery; No local isolation; Emergency stops needed.
What's involved
Survey → Install → Commission → Certify.
How long it takes
Usually a day per machine, planned around production.
Who it's for
Industrial and commercial machinery wiring and isolation
Full details →

Commercial and warehouse LED lighting

LED upgrades for offices, shops, warehouses and car parks, with sensors and emergency lighting.

When you need it
High electricity bills; Old fluorescent or sodium fittings; Dark warehouse or yard.
What's involved
Survey → Design → Install → Certify.
How long it takes
From a day for a small office to a week for a large warehouse.
Who it's for
Commercial and industrial commercial and warehouse LED lighting
Full details →

Shop, office and unit electrical installations

Complete electrical installations for fit-outs, refurbishments and new units.

When you need it
New lease or fit-out; Office reconfiguration; Change of use.
What's involved
Design → Install → Commission → Handover.
How long it takes
Planned per project.
Who it's for
Commercial and industrial shop, office and unit electrical installations
Full details →

Planned electrical maintenance

Scheduled electrical maintenance for commercial and industrial sites.

When you need it
Unplanned outages; Several contractors to manage; Insurer requirements.
What's involved
Asset survey → Schedule → Deliver → Respond.
How long it takes
Ongoing contract.
Who it's for
Commercial and industrial planned electrical maintenance
Full details →

Faults & emergencies

Electrical fault finding

Tracing tripping circuits, dead sockets, flickering lights and burning smells.

When you need it
Breakers or RCD keep tripping; Sockets or lights stopped working; Flickering or dimming lights.
What's involved
Diagnose → Isolate → Repair → Test.
How long it takes
Most faults are found within one to two hours.
Who it's for
Domestic, commercial and industrial electrical fault finding
Full details →

Emergency electrician

Urgent help for power loss, burning smells, water leaks into electrics and storm damage.

When you need it
Total or partial loss of power; Burning smell or smoke; Water leaking into fittings.
What's involved
Call → Make safe → Restore → Repair.
How long it takes
We aim to attend urgent faults the same day where possible.
Who it's for
Domestic, commercial and industrial emergency electrician
Full details →

Need a certificate, a repair or a quote?

Tell us the address and what you need. We reply the same working day.