Fire, electrical & security compliance07517 806082
Get a quote

Domestic electrics

Kitchen and bathroom electrics

All the electrics for a kitchen or bathroom refit, from first fix to final certificate.

Three-phase distribution board with dedicated fire alarm and emergency lighting circuits
Qualified engineersTrained and equipped for the job
Certificates every timePaperwork you can share with insurers and agents
Clear written quotesKnow the price before we start
Fast responseUrgent faults prioritised

About this job

Kitchens and bathrooms need careful planning: socket positions, appliance circuits, under-cabinet lighting, extractor fans, shaver points and zones around water.

We work alongside your fitter or our own team, completing first fix before plastering and second fix once units and tiles are in.

How long it takes

Usually one to two days across first and second fix.

Signs you need it

  • Kitchen or bathroom refit
  • Not enough sockets on worktops
  • Moving appliances
  • New lighting and fans

How it works

  1. 1
    Plan

    Positions agreed with you.

  2. 2
    First fix

    Cables before plastering.

  3. 3
    Second fix

    Accessories after tiling.

  4. 4
    Certify

    Tested and certified.

Modern apartment building exterior

Same-day attendance is often possible for urgent faults. Call 07517 806082.

Who we do it for

Domestic kitchen and bathroom electrics

Homes, flats and rental properties, with tidy work and certificates for landlords and agents.

Domestic electrical work →

Questions we get asked

Can you work with my kitchen fitter?

Yes, we coordinate around them.

What lights can go in a bathroom?

It depends on the zone. We will advise on suitable rated fittings.

Do you cover my area?

Our electricians cover Lancashire, Greater Manchester and Merseyside.

Are you qualified electricians?

Yes. All work is tested and certified, and notifiable work is registered with building control.

From our recent electrical testing & eicr jobs

Photos from our own jobs. Codes, people and other firms' details are blurred.

Three-phase distribution board with dedicated fire alarm and emergency lighting circuits
Three-phase distribution board with dedicated, labelled fire alarm and emergency lighting circuits.
Armoured cables glanded into steel back boxes during an electrical first fix
Armoured cables glanded into steel back boxes at first fix.
Metal-clad consumer unit installed ready for connection
Metal-clad consumer unit installed and ready for connection.

Need a certificate, a repair or a quote?

Tell us the address and what you need. We reply the same working day.