Awaab's Law Phase 2: fire and electrical hazards

From 30 November 2026, social landlords in England must deal with fire and electrical hazards to fixed deadlines. Here's what changes and how a contractor can help you hit them.

Modern apartment building exterior

Updated 5 November 2026

Quick answer

Phase 2 of Awaab's Law extends fixed repair deadlines to more hazards, including fire and electrical. Landlords must investigate within 10 working days, start repairs within 5 working days of the investigation where a significant hazard is found, and complete within 12 weeks. Emergency hazards must be dealt with within 24 hours.

What changes on 30 November 2026

Phase 1 (from 27 October 2025) covered damp and mould and emergency hazards. Phase 2 adds more of the hazards in the Housing Health and Safety Rating System, including fire, electrical, excess cold and heat, falls, structural collapse, hygiene and pests.

The deadlines

StepDeadline
Emergency hazardsMake safe within 24 hours
Investigate a potential significant hazardWithin 10 working days
Start repairs after investigationWithin 5 working days
Complete repairsWithin 12 weeks

Fire and electrical hazards in practice

  • Missing, faulty or disconnected smoke and heat alarms
  • Damaged fire doors, missing closers or seals
  • Breached compartmentation in common areas
  • Exposed live parts, damaged sockets or scorched accessories
  • Unsatisfactory EICRs with C1 or C2 codes left open
  • Faulty emergency lighting or smoke ventilation in blocks

How we support housing providers

We provide fast investigation visits with photo reports, emergency make-safe, and repairs across fire alarms, fire doors, electrical, emergency lighting and AOVs. One contractor covering all of these makes the deadlines easier to meet and keeps the evidence in one format.

Questions we get asked

Does Awaab's Law apply to private landlords?

It currently applies to social housing in England. Private renting reforms are separate.

Can you work to our job management system?

Yes. We can work to your job numbers, timescales and reporting format.

Need this done?

Tell us the address and what you need, or send a photo. We reply quickly with a clear written quote, covering across Lancashire, Greater Manchester and Merseyside.

Get a free quote Call 07517 806082

From our recent jobs

Photos from our own jobs. Codes, people and other firms' details are blurred.

Three-phase distribution board with dedicated fire alarm and emergency lighting circuits
Three-phase distribution board with dedicated, labelled fire alarm and emergency lighting circuits.
Armoured cables glanded into steel back boxes during an electrical first fix
Armoured cables glanded into steel back boxes at first fix.
Metal-clad consumer unit installed ready for connection
Metal-clad consumer unit installed and ready for connection.

Need a certificate, a repair or a quote?

Tell us the address and what you need. We reply the same working day.