Five-yearly electrical checks now apply to social housing in England. Existing tenancies had to be checked by 1 November 2026. Here's what's required and how to catch up.

Modern consumer unit with circuit breakers

Updated 5 November 2026

Quick answer

Social landlords in England must have the electrical installation in each home inspected and tested at least every five years, and check landlord-supplied electrical equipment. For tenancies that existed before 1 December 2025, the first checks were due by 1 November 2026. Unsafe equipment must be fixed within 28 days at the latest.

The key dates

DateWhat applies
1 December 2025Duties start for new tenancies
1 May 2026Regulations fully in force
1 November 2026Deadline for existing tenancies
Every 5 yearsRepeat inspection and testing

What landlords must do

  • Have the installation inspected and tested by a qualified person
  • Check electrical equipment you supply
  • Give tenants a copy of the report
  • Complete remedial work within 28 days or sooner if the report says
  • Keep records to show compliance

Missed the deadline?

Prioritise homes with no record of a recent EICR, then those with older reports or known issues. We can test at volume, issue reports quickly, and price remedials as we go.

Questions we get asked

Is an EICR the same as a landlord electrical certificate?

Yes. The EICR is the report that shows whether the installation is safe for continued use.

Can you work through a large programme?

Yes. We plan programmes by postcode to keep costs and access visits down.

Need this done?

Tell us the address and what you need, or send a photo. We reply quickly with a clear written quote, covering across Lancashire, Greater Manchester and Merseyside.

Get a free quote Call 07517 806082

From our recent jobs

Photos from our own jobs. Codes, people and other firms' details are blurred.

Three-phase distribution board with dedicated fire alarm and emergency lighting circuits
Three-phase distribution board with dedicated, labelled fire alarm and emergency lighting circuits.
Armoured cables glanded into steel back boxes during an electrical first fix
Armoured cables glanded into steel back boxes at first fix.
Metal-clad consumer unit installed ready for connection
Metal-clad consumer unit installed and ready for connection.

Need a certificate, a repair or a quote?

Tell us the address and what you need. We reply the same working day.