Fire, electrical & security compliance07517 806082
Get a quote

Installation

Emergency Lighting installation

New emergency lighting, designed around your building and installed to a high standard.

Three-phase distribution board with dedicated fire alarm and emergency lighting circuits
Qualified engineersTrained and equipped for the job
Certificates every timePaperwork you can share with insurers and agents
Clear written quotesKnow the price before we start
Fast responseUrgent faults prioritised

Emergency Lighting installation

Every installation starts with a survey. We look at how the building is used, where equipment needs to go and how cables or pipework can be run neatly.

You get a clear written quote, an agreed installation date and a tidy team on site. Once installed, the system is tested, commissioned and handed over with full paperwork.

We install for homes, landlords, businesses and industrial sites, from single units to full systems across large buildings.

Emergency lighting that actually lights the way out when the power fails. We test, repair, upgrade and install maintained and non-maintained fittings, exit signs and central battery systems.

What's included

  • Annual 3-hour duration test
  • Battery and lamp replacement
  • LED upgrades and new exit signage
  • Test certificate and log book

How it works

  1. 1
    Survey

    We visit and assess the site.

  2. 2
    Design and quote

    The right system at a clear price.

  3. 3
    Install

    Fitted neatly with minimal disruption.

  4. 4
    Test and hand over

    Commissioned, certified and explained.

Fire alarm control panel mounted in a building corridor

Questions we get asked

How long does an installation take?

Smaller jobs are often done in a day. Larger systems are planned in stages, and we agree the timetable with you up front.

Do you provide paperwork?

Yes, every installation is handed over with a certificate and the information you need to keep it maintained.

What is a full-duration test?

Every fitting is run on battery for its full rated time, usually three hours, to prove it will last an evacuation.

Can you upgrade old fluorescent fittings?

Yes. Switching to LED self-test fittings cuts maintenance and running costs.

From our recent emergency lighting jobs

Photos from our own jobs. Codes, people and other firms' details are blurred.

Three-phase distribution board with dedicated fire alarm and emergency lighting circuits
Three-phase distribution board with dedicated, labelled fire alarm and emergency lighting circuits.

Types of emergency lighting jobs we do

Every type of emergency lighting job we carry out, with when you need it, what's involved and how long it takes. Domestic, commercial and industrial.

Annual 3-hour tests

Full-duration testing of every fitting with a certificate.

When you need it
You have no record of a full-duration test in the past year.
What's involved
Every fitting run on battery for its full rated time, failures recorded, certificate issued.
How long it takes
Usually half a day, plus the test duration.
Who it's for
Domestic, commercial and industrial annual 3-hour tests

Monthly flick tests

Short tests recorded in your log book.

When you need it
You need monthly tests logged but have no one to do them.
What's involved
Short test of every fitting, results logged.
How long it takes
Usually under an hour.
Who it's for
Domestic, commercial and industrial monthly flick tests

Battery replacements

New batteries for fittings that fail duration tests.

When you need it
Fittings fail the duration test or charge lights are out.
What's involved
Batteries replaced and the fitting retested.
How long it takes
Usually a few hours.
Who it's for
Domestic, commercial and industrial battery replacements

LED upgrades

Old fluorescent bulkheads swapped for LED self-test fittings.

When you need it
Old fluorescent bulkheads are failing or costly to maintain.
What's involved
Old fittings swapped for LED self-test units.
How long it takes
Usually a day for a small building.
Who it's for
Domestic, commercial and industrial LED upgrades

New installations

Emergency lighting for escape routes, stairwells and open areas.

When you need it
Escape routes, stairwells or open areas have no emergency lighting.
What's involved
Layout designed, fittings and signs installed, tested and certified.
How long it takes
One to three days depending on size.
Who it's for
Domestic, commercial and industrial new installations

Exit sign upgrades

New illuminated exit signs on every escape route.

When you need it
Exit signs are missing, unlit or the wrong style.
What's involved
New illuminated exit signs fitted on every escape route.
How long it takes
Usually a few hours.
Who it's for
Domestic, commercial and industrial exit sign upgrades

Emergency lighting fault finding

Tracing fittings that stay dark, charge faults and wiring problems so every emergency light works when the power fails.

When you need it
Fittings show charge faults, fail tests or stay off when the mains is cut.
What's involved
Supplies, charge indicators, batteries and control gear checked, faulty parts replaced and fittings retested.
How long it takes
Usually a few hours.
Who it's for
Domestic, commercial and industrial emergency lighting fault finding

Central battery systems

Testing, repair and battery replacement on central battery systems that power emergency lighting across a whole building.

When you need it
The central battery panel shows faults, the batteries are ageing, or the system fails a duration test.
What's involved
Panel, chargers and batteries tested, circuits checked, failed batteries or parts replaced and a full-duration test run.
How long it takes
Usually half a day to a day.
Who it's for
Commercial and industrial central battery systems

Self-test emergency lighting

Self-test and addressable fittings that run their own checks and report faults, cutting down manual testing on larger sites.

When you need it
Monthly manual testing is hard to keep up with, or the site has a large number of fittings.
What's involved
Self-test or addressable fittings installed or converted, test schedule set, and fault reporting checked.
How long it takes
Usually one to two days, depending on the number of fittings.
Who it's for
Commercial and industrial self-test emergency lighting

Emergency lighting surveys

A walk-round survey showing where emergency lighting is missing, failing or not covering escape routes, with clear recommendations.

When you need it
A fire risk assessment flags emergency lighting, or you are unsure the current layout is adequate.
What's involved
Escape routes, stairs, exits and open areas checked against existing fittings, gaps marked on a plan and a report issued.
How long it takes
Usually one to three hours on site.
Who it's for
Domestic, commercial and industrial emergency lighting surveys

Need a certificate, a repair or a quote?

Tell us the address and what you need. We reply the same working day.